Laserfiche WebLink
. <br />�����L <br />� � � PACI�C <br />GENER.AI CONTR.ACTORS <br />Broadwav South Condominiums <br />Offsite cost analysis at Bruadway Cutoff <br />December 8, 1995 <br />1) Earthwork: <br />a. �lsphalt cut/demolition, grading. subbase preparation <br />b. ;;ignal ,I-box relocation with loop replacement <br />2) Asphalt: <br />a. Six inch crushed/2 1/2" asphalt(760 c.y. x$12.60/c.y.) <br />b. 1 1/2" overlay from cenierline (1760c.y. x$7.20/c.y.) <br />3) Curb / Gutter / Sidewalk: <br />a. Curb and Gutter(dlO l.f. x$6.25/I.£) <br />b. Sidewalk(4101.f. x 5'-0 x$1.29/s.f.) <br />4) Survey / Staking: <br />a. Slope staking and curb staking <br />TOTAL = <br />323ATelegraphlioad • Ilellingham,ll'A9t„p . �;i,n� i;�+�'R7: • I;bril(,71 ?s7; • 1'AXI�bU�b�l-iGlb <br />$11, 500.00 <br />$8,375.00 <br />$9,576.00 <br />$4,400.00 <br />$2,562.00 <br />$2,645.00 <br />1 200.00 <br />$41,258,00 <br />