My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8204 SPOKANE DR 2016-01-01 MF Import
>
Address Records
>
SPOKANE DR
>
8204
>
8204 SPOKANE DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:33:06 AM
Creation date
3/9/2017 11:56:51 PM
Metadata
Fields
Template:
Address Document
Street Name
SPOKANE DR
Street Number
8204
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />COST ESTIMATE SHEET <br />Receipt # � �. 7 �'i <br />X Cost of Work Order <br />Cost of Service Order <br />Contact Person <br />Kevin Devories <br />Requested By Kirk Brooks <br />Public Works Departmeot <br />Utilities Divisioo <br />� !:'; � '? � � ;_' � 3200 Cedar Street <br />�995 ''- Everett, Wayhington 98201 <br />__C�TY p� ���[RETT� �Zo6>zs9-ssoo <br />P���'��� �'�°�ks Dept, Date Paid <br />$3,165.00 WorkOrder # <br />proPerty Owner (name) EXXEL llevelopment (Charles Morgan & <br />Charge Cost to (name if different than owner) Sam <br />Address 7301 Beverly Lane City <br />Installation Location Spokane Street and S. Broadwa <br />Installation type/description/size%tc. <br />Service Order H <br />Telephone # 360-671_ZZ79 <br />Date of Request 12-7_ <br />Zip 98203 <br />Per pinns one 8" tap on 1 Z" main , 6" connection to new contractor <br />installed 8" main. <br />� 'ihe following estimate is based upon tne Utilities Division providing all labor, equipment, materials, <br />restoration, and final hook-up. <br />❑ The following estimate is based upon the Street Division work group providing all labor, equipment, <br />materials and restoration to property. <br />allow for`ched ,�lin� nod oarb o_ ro��r�m i <br />Whenever the aHmated cost is not suflicicnt to cover t6e total ezpense for laoor, matcrial, equtpment rcntal and <br />administnHve costs, the deficit ehall be charged to the property for which such installation was made end the owner <br />therrnf, and provided Nrther, tAat any ezcess payment shall be returned to the person applying for the installation. <br />� Itemized Cost EsHmate: <br />Labor & Benefits <br />Material <br />Equipment Rental <br />Surface Restoration <br />Sales Tax <br />TOTAL <br />Prepared by: John Garza <br />Accepted by: <br />cosrncrroicseeoryui un�» <br />1,316.00 <br />1,143.00 <br />709.00 <br />53,168.00 <br />Date Est. <br />cc: Bldg. Permit Center <br />Clair Olivers <br />Tom Thetford <br />Kirk Brooks <br />Gordon Witcher <br />Dan Lowell <br />Stan Mitchell <br />Paul McKee <br />Gerry Crum <br />pr oa d• I Representing: <br />12-7-95 <br />1 u: ��i �;,u�. .� <br />
The URL can be used to link to this page
Your browser does not support the video tag.