Laserfiche WebLink
'`F kaf�STiNG SEP 0 6 199b <br />cc.osso cx Woxx ottn8xs Rseoirr <br />Total Utility Maintenance Management System <br />05/29/1996 Page 1 <br />------------------------------------------------------------- --- ----- <br />Date Range :O1/09/1989 - 05/17/1996 <br />C!I Work Order Ranqe :1001091070001 - UT1002- - Pattern :7101196648764 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program d.LL Funct3on I�Li, Activity ALL <br />----------_---------------------------------------------------------------- <br />C!I WORK ORDER ID: 7101196648764 Title: SO 2 INCH 8216 SPOKANE DR <br />«DUPLIC?.TE PRINTING OF THIS WORK ORDER» <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: 05/17/1996 <br />Overall Craft: <br />issued: 05/14/1996 Issued by: WMW Assiqned to: <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Readinq: <br />Downtime: 0 hours <br />status: <br />Labor: <br />Craft ID <br />UL GDJ <br />LUSW RJW <br />UL SSJ <br />' WST TDE1 <br />WST WDT <br />SUP1 WMW <br />Naterials: <br />ID <br />Bt�X000043547 <br />80X000044647 <br />BOX000056147 <br />CORP38002547 <br />COUP38007447 <br />ELL038106447 <br />ELL038107947 <br />METE38137747 <br />N/1► <br />NIPP34131847 <br />PIPE38060947 <br />SADD46018647 <br />SETT38033447 <br />VALV38034348 <br />WIRE00119847 <br />Name <br />GOSS, DI►NMY JA![ES <br />RICE, JI►![ES W. <br />SMITH, STEVE J. <br />THOMPSON, DW.�,YNE E. <br />Wl,LDEN, DAROLD T. <br />Wl,RD, MICfiAEL W. <br />Descriptlon <br />BOX VAI,VE 18" CI TOP&LID ONLY <br />BOX VAI,VE 5 � PI,ASTIC <br />BOX METER PI.7� 17" X 30^ W/LID <br />CORP STOP 2° KIP X MIP @ <br />COUPLING COlIP 2" FIP X CTS @ <br />ELL 2° 90 DEG BRASS ^ <br />ELL 2" 90 DEG STREET BRASS ^ <br />METER 2^ NEPTUNE W/PRO READ <br />2° T-10 PRO REI1D REGISTER GEAR <br />NIPPLE 3/4" X 3" BRASS ^ <br />PIPE 2" POLY C.T.S. <br />SERVICE SaDDLE 8" W/2" IP DBL <br />SETTER CUST 2" LENGTH 12"X 17" <br />VALVE GATE 2" SUPER HEAVY DUTY <br />TR?.CING WIRE 10 GAUGE <br />Planned Hrs Actual Hra Cost <br />----------- ---------- ------- <br />0.00 2.50 31.83 <br />0.00 1.00 21.63 <br />0.00 6.00 89.46 <br />0.00 1.50 25.86 <br />0.00 6.00 119.52 <br />0.00 1.00 21.34 <br />Total Labor Cost: 309.64 <br />Date <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/20/1996 <br />05/17/1996 <br />U5/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />05/17/1996 <br />/' Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />28 <br />1 <br />1 <br />1 <br />30 <br />Cost <br />16.88 <br />36.27 <br />73.59 <br />54.29 <br />23.44 <br />6.74 <br />9.87 <br />429.32 <br />102.79 <br />1.29 <br />29.12 <br />23.75 <br />272.62 <br />91.80 <br />3.30 <br />Total Material Cost: 1175.07 <br />- l��- <br />lo�a,a� <br />