Laserfiche WebLink
BMP C160: Certifled Erosfon and Sediment Cont�ol Lead <br />Purposr Thc pmjcct proponcnt dcsignatcs at least onc person as thc responsiblc <br />represcntativc in charbc of crosion and scdintcnt control (ESC), and watcr <br />quality protect;on. Thc designatcd person shall be thc Ccrtificd C•rosion <br />and Scdimcnt Control Lcad (Cf:SC,L) who is responsible Cor cnsuring <br />compliance with all loc�l, state, and feder.�l erosion and scdiment control <br />and watcr quality req��iremenu. <br />Condirinns njUse A CESCL shall bc made availablc on projccis one acrc or larger Ihat <br />dischargc slarmwalcr �o surfacc watcrs of the statc <br />. 'I'hc CESCL shall: <br />• Havc a currcnt ccrtificnlc proving aticndance in an crosion and <br />sediment control training caurse that meets the minimum ESC <br />tr.�ining and certification requirements established by L•cology <br />(scc dctails hclo���). <br />Ecologp ���ill maintain a Iis1 of IiSC training and cenification <br />��m�•idcrs at: �������r.cc��.���:i.cuv/procramsi�cq%slonmcatcr. <br />OR <br />• 13c a Cenified Professional in Erosion and Sediment Control <br />(CPESC); for additional infonnation go io: �v�c���.cncscnet <br />Specifica�ions , Ccnification sh�ll rcm.:un valid for Ihrec years. <br />• Thc CGSCL shall ha��c authont}' to ac� on bch�lf of thc rontr�c�or or <br />dc��cloper and shall bc availablc, o� call, 24 hours per day d�roughout <br />thc period of constnic�ion. <br />• Thc Cnnsln�ction S\\'PPP shall includc thc namc, tclephonc numbcr, <br />fax nuntbcr, and address of thc dcsignatcd CL•SCL. <br />. A CESCL may provide inspection and compliance sen•ices for <br />multiple constniction projects in Ihe sanu gcographic region. <br />Du�ics and responsibili�ics of thc CESCL shall includc, hut arc not limitcd <br />to lhc followin�;: <br />. Maintaining pcnnit filc on sitc at all times �shich includcs thc S�'�'PPP <br />and any associatcd pcm�it, and plans. <br />Dircc�ing BMP inslallaticm. inspcction, maintcnancc, modification, <br />and removal. <br />• Updating all project dra�vings and thc ConsWc�ion SWPPP with <br />changes madc. <br />February 2005 Volun, e ll — Consfrucfron Sformwater Pollution Prevenfion 4-47 <br />