My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT SECCION 01500 <br />UMON SLOUGH MARSH MTC[GATION CONSTRUC'i'[ON <br />FAC[LTITES AND <br />TEMPORARY CONTROLS <br />UT[L(TIES <br />A. Cc�rdinate security requirements with PORT. CONfRA(,TOR to provide security and <br />facilities to protect work and construcNon storage. <br />1.8 ACCESS ROADS <br />{ A. Provide and rt�aintain access roads required for execution of the work. <br />fI.9 PARKING <br />A. <br />1.10 <br />A. <br />B. <br />C. <br />1.11 <br />A. <br />B. <br />1.12 <br />When site space is not adequate, provide additional off-site parking. <br />PROGRESS CLEANING <br />Maintain areas free of waste materiaLs, debris, and rubbish. Maintain site in a clean and <br />orderly condition. <br />Remove waste materials, debris, and rubbish from site periodically and dispose off-site. <br />Keep City streets clean. No flushing or washing shall be allowed. <br />DUST AND EMISSIONS CONTROL <br />Execute work by methods to minimiu raising dust from consdvction operations. <br />Provide positive tneans to prevent a'v-bome dust from dispersing into atmosphere. <br />NOISE CONTROL <br />IA. General: The CONTRACTOR shall conduct all his work, use appropriate construction <br />methods and equipment, and fumish and install acoustical barriers, all as nxessary so that <br />� no noise emanating from the process or any rolated tool or equipment will exceed kgal <br />noise levels determined by appropriate agencies. <br />� B. Nighttime Work: If the CON7'R.4CfOR des¢es to perfortn any work outside of nomial <br />working hours, COIV7'RACTOk shall obtain all nxessary permits from the appropriate <br />agencies and malce all necessary arrangements prior to commencing. <br />� C. Mitigation of Conswction Noise Ir�act: The CONfRACTQR shall submit to the <br />Enginar his plans to mitigate the construction noise impacts, including the method of <br />- construction, the equipment to be used, and acoustical veatments if necessary. <br />I <br />PART2-PRODUCTS <br />NOT USED. <br />01500-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.