My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3501 SR 529 2016-01-01 MF Import
>
Address Records
>
SR 529
>
3501
>
3501 SR 529 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 8:11:25 AM
Creation date
3/10/2017 12:05:32 AM
Metadata
Fields
Template:
Address Document
Street Name
SR 529
Street Number
3501
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT OF EVERETT <br />r UNION SLOUGH MARSH MITIGATION <br />� <br />!� <br />C� <br />� <br />1.5 <br />A. <br />i� <br />SECTION 01700 <br />CONTRACTCLOSEOUT <br />ENGINEF.R will inspa:t to verify status of completion with reasonabk prompmess after <br />receipt of such certifications. <br />If ENGINEER finds incompkte or defective work: <br />1. ENGINEER will promptly prepaze a punchlist and notify CONTRACI'OR in <br />writing, listing incom�kte or defective Work. <br />2. CONTRACTOR shall talce irrrixdiate steps to romedy stated defxiencies and send <br />second written certi5cation to ENGINEER that Work is com�kte. <br />3. ENGIIVEER will reinspect Work. <br />When ENGINEER finds Work is acceptabk, he will request CONTRACTOR to make <br />closeout submitteLc as speci5ed herein before. <br />F[NAL ADNSTMENT OF ACCOUN7'S <br />Submit a fi:.al statement of accounting to ENGINEEIt. <br />Statement shall rctlect all adjustments to the Contract sum: <br />I. The original Contract sum <br />2. Additions and deductions resulting from: <br />a Previous change orders. <br />b. Allowances. <br />c. Unit prices. <br />d. Deductions or uncorrected work. <br />e. Penalties. <br />f. Deductions for liquidated dartw�ges. <br />g. Deductions for reinspection payments. <br />h. Ocher adjustments. <br />3. Total Contract sum, ac adjusted. <br />4. Previous payments. <br />5. Sum remaining due. <br />C. ENGINEER w•c: ,repaze a final change order, reflecting approved adjustments to the <br />Convact sum wluch were not previously made by change orders. <br />PART 2 - PRODUCTS <br />NUT USED <br />01700-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.