Laserfiche WebLink
PORT OF EVERETT <br />UIVION SLOUGH MARSH MITIGATION <br />SECTION 02273 <br />TEN�ORARY EROSION <br />CONTROL <br />PART 1 - GENERAL, <br />1.1 GENERAL <br />A. This work shall consist of preparing a Spill Prevention, Control, and Countermeasures <br />(SPCC) Plan and preparing for implementation of the plan. <br />1.2 SECTION INCLUDES <br />A. Silt Control Measures <br />B. Terr�orary Stormwater Runoff Control <br />C. Dust Control • <br />D. Noise Control <br />E. Soil Stabilization from Erosion <br />1.3 R£?LATED SEC770NS <br />A. Section 02200 - EARTHWORK <br />1.4 REGULATORY REQUIREMENTS <br />A. City of Everett Design and Conswction Standazds and Specifications. <br />B. WSDOT Standazd Specification: 2000 Standard Specifications for Road, Bridge, and <br />Municipal Construction, Washington Department of Transportation. <br />1.5 SUBMITTALS <br />A. Filter Fabric Fence: Product Data <br />1.6 SEQUENCING <br />A. Erosion Conuol shall be in place and operative prior to all other work associated with this <br />project. <br />1.7 UNIT PRICES <br />A. The lump sum contract price for the "3pill Prevention Plan" shall be full pay for all labor, <br />equipment, material and overhead costs associated with the preparation of the SPCC Plan <br />and any coordination and prepazation naded prior to implementation. <br />02273-1 <br />