Laserfiche WebLink
PORT OF EVERETT Secdon 00300 <br />f UNION SLOUGH MARSH MTfIGATION Bid Form <br />� <br />item Approx. Description of Item Unit Price Total Price <br />No. uand ith Unit Pria Written in Words Dlrs. Cents Dlrs. Cents <br />]0. 5,000 Silt Fence a $ <br />Linear Fat . <br />r Linear Foot <br />l 1. Lump Sum Erosion Control S S <br />r Lum Sum <br />12. 8 Hydrosading, Fertilizing, & Mulching_ S S <br />Acnes <br />Acce <br />l3. Lum;; Sum Landscaping s $ <br />r Lum Sum <br />TOTAL BASE Bm (including Trcnch Ezcavation Sajtry Provisiont) a <br />TRENCN IXCAVATION SAFE/'Y PROVISION <br />If the bid amount contains any wak which rcquires henching exceeding a depth of <br />4 fat, all costs for trench safery shall be included in the Base Bid �nd indicated <br />above for adequate trench safety systems in compliance with Chaper 39.04 RCW <br />49.17 RCW and WAC 296-I55-650. Bidder must include a lump sum dollar <br />amount in blank above (even if the value is 50.00) to be responsive. <br />a <br />(lneludtd also in Bate <br />Bid) <br />5. Any unit price that is left blank or does not coatain numeric figurcs will be considered no <br />charge for that bid item. The extension for that bid item will also be ueated ac no charge and <br />reflected as such in the total contrsct pria regacdless of what has ban placed in the <br />extension column. <br />6. Payment to the Contractor will be made at the nnit prices only for the sctus! quandties of <br />work perfom►ed and acceptai in confom�ance with the convact. When the accepted <br />quantities of work vary from the original bid quenddes, payment will be made at the unit <br />convact prices for acapted work unless the total quantiry of any contract item, using the <br />original bid quantiry, increases or decreases by more tl�en 25 perc,ent. In that case, that pazt of <br />the incrcase or dec�ease excading 25 percent will be adjusted ac follows: <br />a. Incesased Quantities: Either pany to the convact will be entided to renegotiate the <br />price for that portion of the actual quantiry in excess of 125 percent of the original bid <br />quantiry. The price for the increased quantides will be detemuned by agreement of <br />the parties, or, where the parties cannota�c , the price will be dete�mined by the <br />Enginar based on the actual costs to pedocm the worl�, including reasonable markup <br />for overhead and profit. <br />b. Decreaud Quantities: Either party to the contract will be entided to an equitab►e <br />adjustment if the actual quantiry of work perfortned is less than 75 pecrent of the <br />original bid quantiry. The equitable adjustment in the case of dec�eased quantities <br />00300-3 BmDER'S NAME <br />