Laserfiche WebLink
PORT OF EVERETT SECTION 00700 <br />UMON SLOUGH MARSH MITIGATION GENERAL CONDITIONS <br />6.7.1 Requests for review of substitute items of material and equipment will not be accepted by <br />ENGINEER from anyone other than CONTRACI'OR. If COIVTRAC7'OR wishes to furnish ur use a <br />substitute item of material or equipment COIVTRACTOR shall make written appGcation to <br />ENGINEER for acceptance thereof, certifying that the proposed substitute will perform adequately <br />the functions called for by the general design, be similar and of equal substance to that speci5ed and <br />be suited to the same use and capable of performing the same function as that specified. The <br />application will s;ate whether or not acceptance of the substitute for use in the Work will roquire a <br />change in the Drawings or Specifications to adapt the design to the substitute and whether or not <br />incorporation or use of the substitute in connection with the Work is subject to payrrr.nt of any <br />license fee or royalty. All vaziations of •� proposed substitute from that specified shall be identified <br />in the application and available mainten. nce, npair and replacement service will be indicated. The <br />appGcation will aLso contain an itemiud estimate of all costs that will result d'axtly or ind'¢ectly Gom <br />acceptance of such substitute, including cr,sts of redesign and clairtu of other contractors affected by <br />the resulting change, all of which shall be c• .:idered by ENGINEER in evaluating the pro- posed <br />substitute. ENGINEER may require CON7'RACTOR to furnish at CONTRACCOR's expense <br />additional data about the proposed substitute. ENGINEER will be the sok judge of acceptability, <br />and no substitute will be ordered or installed without ENGWEER's prior written acceptance. PORT <br />may requ've CONTRACTOR to furnish at CONTRACTOR's expense a special perfortnance <br />guaranta or other sur�ty with respect to any substitute. <br />6.7.2 ENGINEER will record time requaed 'oy ENGINEER and ENGINEER's consultants in <br />evaluating substitutions proposed by CONTRAC'COR and in malcing changes in the Drawinv,s or <br />Specifications occasioned thereby. Whether or not ENGINECR accepts a proposed substi:�:te, <br />CONTRACTOR shall reimburse PORT for the chazges of ENGINEER and ENGINEER's <br />consultants for evaluating any proposed substitute. <br />Concernine Subconvactors: <br />6.8 CONfRACfOR shall not employ any Subcontractoi or other person or organization (including <br />those who are to fumish the principal items of materials or equipment), whether initially or as a <br />substitute, against whom PORT or ENGINEER may have reasonable objection. A Subcontractor or <br />other person or organization identified in w�riting to PORT and ENGINEER by CONTRACTOR <br />prior to the Notice of Award and not objected to in writing by PORT or ENGINEER prior � the <br />Notice of Awazd will be damui acceptable to PORT and ENGINEER. Acceptance of any <br />Subcontractor, other person or organization by PORT or ENG[riEER shall not constitute a waiver of <br />any right of PORT or ENGINEER to reject defective Work. If PORT or ENGINESR aftet due <br />investigation has reasonable objection to any Subcontractor, other person or organization proposed <br />by CON'I'RACCOR after the Notice of Awazd, CONTRACTOR shall submit an acceptabk substitute <br />and the Contract Price shall be inaused or decreased by the difference in cost occasioned by such <br />substitution, and an appropriate Chenge Order shall be issued. COIVTRACTOR shall not be required <br />to employ any Subconvactor, other person or organization against whom CONTRACTOR has <br />reasonable objection. <br />6.9 CONTRACTOR shall be fully responsible for all acts and omissions of his Subcontractors and of <br />person. and organizations d'uectly or ind'vectly employeci by them and of persons and organizations <br />00700-23 <br />