Laserfiche WebLink
�: % <br />PaSr'�p �� ��90 - <br />� ! . �, <br />. _ ;, <br />CLOSED CM WORK ORDERS REPORT <br />Streets Total Utility Maintenance Management System <br />09/25/90 <br />Date Ranqe :03/15/88 - 09/25/90 <br />CM Work Order Range :1071090001 - 9321230003 Pattern :6751190185 <br />item Range :<Blank> - Y7VL3195Q19 Pattern :* <br />Utility ALL Program ALL <br />------------------------------------------------------�-------------- <br />------------------------------------------------------•-------------- <br />CM WORK ORDER ID: 6751190185 Title: RENEW/4020 OLD HWY 99 N <br />Item ID: WS0595H003 -- WATER SERVICE <br />Location ID: -- <br />Utility 675 Proqram 119 <br />Date Completed: 09/19/90 <br />Overall Craft: <br />Issued: 08/30/90 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL SRJ <br />UL TDE1 <br />*faterials : <br />ID <br />ADAP36001047 <br />ADAP36001147 <br />CORP3600 J47 <br />COUP36006647 <br />PIPE3606�747 <br />Issued by: SRL Assigned to: SRJ <br />Priority: Travel T�me: 0.00 Hr. <br />Page 1 <br />Name Planned Hours Actual Hours Cost <br />------------------------------ ------------- ------------ --------- <br />STENSETH, ROBERT J. 0.00 2.00 26.44 <br />THOMPSON, DWAYNE E. 0.00 2.00 19.44 <br />Description <br />------------------------------ <br />ADAPTER 1" CST X INSTA-TITE @ <br />ADAPTER 1" IPS ONION INSTA @ <br />CORP STOP 1" MIP - FLARE COP @ <br />COUPLING 1" 1/8 BEND COPPER C <br />PIPE 1" POLY I.P.S. <br />Vehicles: <br />ID Description <br />------------ ------------------------- <br />V2139 SVC TRUCK CHEV A5 <br />Date <br />OS/31/90 <br />OS/31/90 <br />08/31/90 <br />C8/31/90 <br />08 j ? 1/90 <br />Date <br />08/31/90 <br />Number <br />1 <br />1 <br />1 <br />1 <br />1 <br />Hours <br />2.00 <br />Cost <br />8.30 <br />11.52 <br />10.70 <br />7.02 <br />0.47 <br />Cost <br />4.92 <br />