My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2325 STATE ST 2016-01-01 MF Import
>
Address Records
>
STATE ST
>
2325
>
2325 STATE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 7:34:06 AM
Creation date
3/10/2017 12:34:13 AM
Metadata
Fields
Template:
Address Document
Street Name
STATE ST
Street Number
2325
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOSSD CM WORR ORDERS REPORT <br />Total Utility Maintenance Manaqement System <br />05/06/1996 Page Z <br />Date Ranqe :O1/09/1989 - 05/02/1996 <br />CM Work Order Ranqe :1001091070001 - UT1002- - Pattern :7101096750067 <br />item Range :<Blank> - WF122020001 Pattern :* <br />Proqram ?.I.L Function ALL Activity ALL <br />_______=___—_____=_________=--------------- <br />CM WORK ORDER ID: 7101096750067 (continued) <br />WYE044303947 WYE 6^ ?,I.L GASKETED <br />Vehicles: <br />ID <br />V2085 <br />V2138 <br />V2152 <br />V3603 <br />V6807 <br />VJ0002 <br />VJ0004 <br />Description <br />91 GMC PU 4x4 <br />86 CHEV 1-TON <br />g7 DODGE W/HOIST <br />86 CASE BACKHOE 780 <br />89 COMPRESSOR IR <br />93 INTERNATIONAL 10 YD <br />�95 CHEV 1-TON <br />04/17/1996 1 <br />Total Material Cost: <br />Aours <br />9.00 <br />2.00 <br />34.00 <br />22.00 <br />10.00 <br />38.00 <br />8.00 <br />Total Vehicle Cost: <br />Cost <br />50.04 <br />10.20 <br />173.40 <br />930.60 <br />49.00 <br />858.80 <br />48.80 <br />2120.84 <br />, Work Description: <br />------------------------------------------------------------------------- <br />MAIN IS 16�5 DEEP. SIDE SEWER FOR 2326 HIGHLAND IS 115�6 FROM MANHOLE IN 24TH <br />REPLACED FROM MAIN TO P.L. STANDPIPE IS 11'DEEP. SIDE SEWER 10' DEEP AT P.L. <br />SIDE SEWER FOR 2325 STATE IS 118' FROM MANHOLE IN 24TH. S.P. IS 6' DEEP. SIDE <br />SEWER IS 5' DEEP AT P.L. <br />Total cost for work order 7101096750067: 5836.48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.