My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2518 STATE ST 2016-01-01 MF Import
>
Address Records
>
STATE ST
>
2518
>
2518 STATE ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 7:08:43 AM
Creation date
3/10/2017 12:45:26 AM
Metadata
Fields
Template:
Address Document
Street Name
STATE ST
Street Number
2518
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLOBBD CM 1POR1C ORDSRB RSPORT <br />� Total Utility Maintenance Management Syetem <br />____--- 10/29/1998 Page 2 <br />veacanvaaavnav:zeaasvsaavsa'sovevaa:eeae:aame=evvmvze'==cesevvevvo= <br />Date Range :06/24/1900 - 10/28/1998 <br />CM Work Order Range :OB10800810001 - UT2883- - Pattern :7101096750415 <br />Item Range :<Blank> - WVI,3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />veaaaaevavanamvvsaavaaaseavaaaemaaaaaavv�e�v�aevxasaee=cvevnme=ova'aosav==a <br />CM WORK ORDER ID: 7101096750415 (continued) <br />WYE044303947 <br />Vehiclee: <br />ID <br />WYE 6" ALL GASKETED <br />Description <br />------------ ------------------------------ <br />V0058 '98 CHEV 1/2 T 4X4 PU <br />V2113 91 CHEV 1-TON <br />V2152 87 DODGE W/HOIST <br />V2230 91 FORD F800 DUMP 5 YARD <br />V2663 87 VACTOR <br />V3603 86 CASE BACKHOE 780 <br />V6807 89 COMPRESSOR IR <br />VJ0002 93 INTERNATIONAL 10 YD <br />VJ0004 '95 CHEV 1-TON <br />Work Description: <br />09/11/1998 <br />Total Material Cost: <br />Hours <br />3.00 <br />5.00 <br />13.00 <br />8.00 <br />5.00 <br />17.00 <br />13.00 <br />21.00 <br />21.00 <br />Total Vehicle Coat: <br />Coat <br />17.70 <br />26.00 <br />62.40 <br />8.00 <br />239.00 <br />661.30 <br />62.40 <br />441.00 <br />121.80 <br />1639.60 <br />9.64 <br />245.39 <br />�/�� <br />(� d <br />---- <br />-------------------------------------------------------------- <br />------------ <br />REPLACED SIDE SEWER FROM MAIN TO PROPERTY LINE. ORIGINIAL STATIONING WAS <br />MAINTAINED. SIDE SEWER IS 4' DEEP AT POERTY LINE. HOOKED UP TO OWNERS PLASTIC <br />Total cost for work order 7101096750415: 3585.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.