Laserfiche WebLink
CONPLIANCE NWEC LOWRISE RESIDENTIAL COMPLIANCE CHECKLIST <br />REOUIRED� El�ctricallv hsated dwelllnps, s 3 storles, Zona 1, Western Weshlnyta <br />INSPECTION <br />APPROVED �MPORTANT: Pl��s� supply Inform�tlon nquestad In ths �pproprlat• <br />th�dad box�s bNow. Disnp�rd boxat that don't d��crlba your bulidinp or <br />•qulpmant. DQNQIP�ec� ch�cks In th� two Isft column�. <br />TION PHASE <br />� W�IIs(Inciudirq rim jolsts) wlll be Insulated wRhout compressbn to: <br />p R-79 batt (ChN6, optlons I,III,IV) ❑ R-24 (Ch AB,Option II) � R-L(Ch # 4 or 5) <br />❑ ❑ BNow pnd� wells rat Insulated on the exterior (Sae FOUNDATION PHASE) will be inaulated to: <br />❑ R-19(Chapter 6, all Optbns) on the IMerbr ❑ R-_ (Chaplers 4, 5, or 7) on ihe interior. <br />❑ p V�ult�d c�lllnpt will be Insuleted without compressbn to: <br />❑ R38(Ch N8, all options; ❑ Fl_(Ch i4 or 5) <br />❑ I I❑ 8kyllpht wall Insuletlon is installed and equivaleM to the required wall R-values <br />(Recommendation: place cellinp Insulatbn batts in place behind skylight welis) <br />Vapor retard�rs will be installed toward the wartn suAece as represer�ed betow: <br />Select one o LLLtiojjj��� for tloors, walls, and appropriate ceilings: <br />Floore: �T Plywood labeled EXPOSURE 1❑ Poly (:4 Mil ❑ backed batts ❑ PVA <br />Wells: ❑ Poly plast� (:4 Mil) ❑ backed batts �PVA <br />Cellinps:'� Not requlred where ventilation space averages >12' above inaulation. <br />❑pdY. PW� ( 41� ❑ back�d patb �Q PVA <br />❑ ❑ H��tlny tyst�m Nflciancy end slzlnp requfrements will be met as represeMed below: <br />Maxlmum heating system capacity (150%of desifln heat load) has been calculated at KW <br />H�et Pump �ff Iclancy wiil be met under the followiny compllance path: <br />❑ Ch �t6, Option IV: air source heat pump: HSPF z 8.8 <br />❑ Ch �15 air sourCe heat pump: HSPF z 8.8, COP z 2.7/2.0 <br />❑ Ch �15 water source heat pump: COP:3.0 <br />H��tinp ty�tam roqulraments will Is met with tollowlnp system: <br />M�� MOd91 N Mpx. OU1pUt KW <br />r..... HSPF COP <br />NWEC Insulatlon phase requlrements: <br />Approved by• <br />Dete <br />WEEB11PN1�00 PpOe 8 01 7 <br />