Laserfiche WebLink
Date���� <br />Application For <br />PUBLIC WORKS PERMIT <br />Print or Type Only <br />owner <br />/ <br />�/z�/ <br />Pu�l¢ Wo�Fs Par <br />BiJq OeO�� • <br />PuDbc Worka fee s <br />Total iee <br />Lesa �ool Fee vaia s �J <br />BalencaDue S/—� <br />Applicant Mailing Address City 2ip Phone <br />Describe Proposed Work ' ` �L� ��� <br />Proiect Address lif knownl <br />191F� SvMMIT <br />Attach four (4) copias of Plans for proposed work - Draw to scale and note the tollowing as applicable: <br />• Property Lines <br />• Outline end dimensions of all existing and <br />praposed structures on the lot <br />• Existing and proposed ulilitles <br />� Centedine of street <br />• Indicate North <br />• Show any proposed grading changes <br />• Show measurements <br />PERMIT CONDIT�ONS <br />1. All calls tor inspectlon ahell be made 24 hrs. In advance • phone 259•8810. <br />2. All work shall be pertormed in accordence with this permit and current City of Everelt Oesign and Construclion <br />Stendards and Speclficeliona. <br />3. Cell Lxatio� Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1•800�4245555. <br />�c�....9. V1/1 `��- Cp -G-� <br />Approved tor Const ction �r- Date <br />/ <br />�ll��-- io-//-t'e <br />FINAL INSPECTION Da�e <br />Approved as Construcled <br />everett PUBLIC WORKS DEPARTMENT <br />� 3200 Cedar Street <br />Everel� WA 98201 <br />Phone: 259•8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />� <br />O <br />� <br />� <br />O <br />a <br />The undersigned owner/applicant herehy agrees to hold and save harm• <br />less ihe City ot Everett irom any and all claims for dameges. cosis. <br />expenses, or causes of action Ihat may arise because oi installation <br />and maintenance ot ihe improvement or other right-oFway use hereto <br />applied tor and further agrees to remove same upon nolice irom ihe <br />Cily and to replace public property damaged thereby. <br />/ -�i/� � Q��i'��iY ir' -�� <br />SI'gpJfure ol Applicant - """ <br />�pRK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />1"80 DAYS OF OATE PERMIT IS ISSUED AND THEFEAFTER IS TO <br />BE DIL�GENTIY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON FNY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />