My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2030 SUMMIT AVE 2018-01-02 MF Import
>
Address Records
>
SUMMIT AVE
>
2030
>
2030 SUMMIT AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 3:32:46 PM
Creation date
3/10/2017 1:02:01 AM
Metadata
Fields
Template:
Address Document
Street Name
SUMMIT AVE
Street Number
2030
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT DATE: <br />ELECTRICAL WIRING PERMIT APPLICATION FEE: <br />JOB ADDRESS Sues"-, iT <br />TENANT W. C'o L-L-1 0 S <br />SAME AS A6UJ E <br />ELECTRICAL CONTRACTOR n wmw <br />LICENSE NO. <br />ADMINISTRATOR <br />EXPIRATION DATE <br />PHONE NO. acA - <br />VALUE OF WORK (do not include taxes) <br />(for commercial work) <br />USE OF BUILDING <br />NOTE: WAC 296-46-140 requires that plans for electrical work at educational, <br />institutional or health care facilities be approved by the Stato of <br />Washington. Applicants with such jobs must show the State -approved plans <br />before a City of Everett permit will be issued. <br />WORK TO BE DONE: Up,C,a A of ScrQ(c_ - CAr�� <br />SIGNEDcub DATE <br />NOTES AND COMMENTS: <br />6/10/87 <br />1928H <br />
The URL can be used to link to this page
Your browser does not support the video tag.