My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2030 SUMMIT AVE 2018-01-02 MF Import
>
Address Records
>
SUMMIT AVE
>
2030
>
2030 SUMMIT AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2022 3:32:46 PM
Creation date
3/10/2017 1:02:01 AM
Metadata
Fields
Template:
Address Document
Street Name
SUMMIT AVE
Street Number
2030
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order <br />Page 1 <br />3/19/2013 10:56 <br />Issued By SJT2 SPOONER. JAMES T. <br />Issued Department PW PUBLIC WORKS <br />Date Issued 211112013 <br />Fund 401 account 5 Program Function Activity <br />Program UT3473 2 3 <br />Title CONVERT .75 INCH 2O30 SUMMIT AVE UT3473-7.3 <br />Work Order No 20130338 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br />Status 2/1112013 Time 14:51 Original WO Billing <br />Customer Information <br />Customer Name <br />Address <br />Apartment No <br />State <br />Subdivision <br />Phone No <br />Second Phone ( I <br />E-Mail Address <br />Problem Information <br />Address 2030 <br />From Cross Street <br />To Cross Street <br />City <br />Subdivision <br />Street <br />City <br />Zip <br />Ext <br />Ext <br />Street SUMMIT AVE <br />Map Book <br />Problem WATER <br />WATER <br />Sub Problem OTHER <br />OTHER <br />Requested By <br />Agency <br />Initiated From <br />Utility Locate (USA) No <br />Called Date <br />Assignment Information <br />Dept <br />Crew <br />Contractor <br />Assigned To <br />Assigned By <br />Assigned Dale <br />To Be Comp Date <br />Scheduled Date <br />Scheduled Time <br />Route <br />Route Sequence <br />Comments <br />Customer Id <br />Change Map YIN <br />Zip <br />Map Reference <br />Date Requested <br />Related Request <br />Expiration Date <br />Priority Estimated Hours <br />Action Taken CONVERT .75 INCH CURBSTOP TO.75 INCH SETTER WI METER AND BOX. FLAT TO METER <br />PROJECT. <br />Recommended Action <br />Approved By HLJ HUSBY, LANCE J. Job Cost Information(YIN) <br />Start Date I I Time _ Date Completed 211212013 Permit No <br />Completed By Time Follow Up? <br />
The URL can be used to link to this page
Your browser does not support the video tag.