Laserfiche WebLink
� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />i 6�onnect side sewer per City Standard #'s 601, 602, 604. <br />� Connect all rooftop dov,nspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _ <br />10. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />11. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan H's 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. ail unused <br />driveways and any broken or damaged area must be replaced). <br />12. Install a Type I concrete driveway per City of Everett Standard #307. <br />13. Pave driveway from the front property line out to the street paving. <br />14. Contact the �__ Water District for connecting provisions for this building's <br />water and sewer services. <br />75. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />17 A sprinkler system is required for this building in compliance with the requirements of NFDA <br />� Standards 13D. <br />i . <br />� I� �.� Li. G-� cs�Va. �n_. � til ,��tE t��- r= z� ; y7 r= o l� ti 0 Ar7c,� <br />�� / 5� OE'a�C•AL'ti C�t�l ✓t'cc,az�t� 5�-f1�'GC �' C H+-�L1l,lr1� i0 t?-iL.' <br />✓ <br />PWCannwn4 <br />/T"�l�ZLL'c7i �t�2�%7:ri��J �/� /�i'0 �C..{STC��UC� CF�%%F�i1/f%G <br />e � �� 3u�cviNtj .C.oJ, <br />�l �4 � v����r��- <br />