Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />Total Utility Maintenance Manaqement System <br />05/20/1996 Paqe 1 <br />-------------------------------------------------------------------------------- <br />Date Ranqe :O1/09/1989 - O5/02/1996 <br />CM Work Order Ranqe :1001091070001 - UT1002- - Pattern :7101196750697 <br />item Ranqe :<Blank> - V'W22020001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 7101196750697 Title: REPAIR 5018 SUNSET LANE <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />item ID: WS3694Z038 -- WATER SERVICE <br />Location ID: -- <br />Proqram 710 Function 119 Activity 675 <br />Date Completed: 05/O1/1996 <br />Overall Craft: <br />Issued: 04/30/1996 <br />Out of Service? NO <br />Meter Readinq: <br />Downtime: o hours <br />Status: <br />Labor: <br />Craft ID <br />WST BBA <br />UL CSG <br />tiat�!rials: <br />ID <br />ADAP.i4000347 <br />ADAP34000547 <br />BOX00��056247 <br />COUP3�:004247 <br />COUP34004347 <br />N/A <br />PIPF34060647 <br />VAL'/34008648 <br />Vehicles: <br />ID <br />V2156 <br />Name <br />Issued by: WMW A:�siqned to: BBA <br />Priority: Travel Ti.me: 0.00 Hr. <br />----------------- <br />BRADLEY, BROCK A. <br />CAVANAH, SHANE G. <br />Description <br />Planned Hrs Actual Hrs Cost <br />---------- ----------- ---------- ------- <br />ADAPTER 3/4" CST X INSTA-TITE@ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" FIP X COP ELL @ <br />COUPLING 3/4" MIP X COP ELL @ <br />METER JUMPER (FROM STOCK) <br />PIPE 3/4" POLY I.P.S. <br />VALVE METR 3/4" L/W FLARD COP@ <br />Description <br />89 DODGE 1 TON <br />Work Description: <br />METER SETTER <br />0.00 3.00 51.72 <br />0.00 3.00 36.36 <br />Total Labor Cost <br />Date <br />04/30/1996 <br />04/30/1996 <br />04/30/1996 <br />04/30/1996 <br />04/30/1996 <br />04/30/1996 <br />04/30/1996 <br />04/30/1996 <br />M Used <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />2 <br />Total Material Cost: <br />Hours <br />3.00 <br />Total Vehicle Cost: <br />Cost <br />16.20 <br />16.20 <br />88.08 <br />Cost <br />22.77 <br />7.68 <br />12.96 <br />4.01 <br />3.81 <br />0.00 <br />1.00 <br />21.46 <br />�r1 <br />',3.69 <br />