My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
503 TAMARACK AVE 2016-01-01 MF Import
>
Address Records
>
TAMARACK AVE
>
503
>
503 TAMARACK AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 8:20:44 PM
Creation date
3/10/2017 1:56:39 AM
Metadata
Fields
Template:
Address Document
Street Name
TAMARACK AVE
Street Number
503
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cr.os� c�t wo� oxnffits x�oirr <br />Total Utility ![sintenance Management System <br />06/25/1996 pgqe 1 <br />Date Range :01/09/1989 - 06/13/1996 + <br />CM Work Order Range :1001091070001 - UT100�- -- Pattern :71017.96750720 <br />item Ranqe :<Blank> - WW22020001 Pattern :* <br />Proqram AI.L Function l►LI. activity ALi. <br />� ---- — <br />C![ WOR1C ORDER ID: 7101196750720 Title: REPl,IR 503 TAMaR2.CK �VE � <br />«DUPLIC2,TE PRINTING OF THIS WORIC ORDER» <br />Item ID: WS0685V015 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 114 Activity 675 <br />Date Completed: 05/31/1996 <br />Overall Craft: <br />Issued: 05/30/1996 <br />Out ot Service? YES <br />Meter Readinq: <br />Downtime: 0 hours <br />Status: <br />Lebor: <br />Craft ID <br />UL GDJ <br />UL SSJ <br />WST TDE1 <br />WST WDT <br />1[aterials: <br />ID <br />Name <br />Issued by: WMW Assigned to: WDT <br />Priority: i Travel Time: o.00 Hr. <br />GOSS, DANMY JAl�ES <br />SMITH, STEVF. J. <br />TFiOMPSON, DW�YNE E. <br />WP,I,DEN, D��ROLD T. <br />Description <br />ADAP34000447 ADI�PTER 3/4" IPS UNION INSTA @ <br />PIPE34060647 PIPE 3/4" POLY I.P.S. <br />Vehicles: <br />ID <br />V2117 <br />Description <br />91 CHE�I 1-TON HYD UNIT <br />Work Description: <br />PLASTIC PIPE SPLIT ON EXTREME BEND. <br />Planned Hrs Actual Hrs Cost <br />0.00 5.00 63.65 <br />0.00 2.00 29.82 <br />0.00 1.00 17.24 <br />0.00 3.00 59.76 <br />Total Labor Cost: <br />Date / Use4 <br />-------- -------- <br />05/30/1996 2 <br />05/30/1996 3 <br />Total Material Cost: <br />xours <br />5.00 <br />Cost <br />28.00 <br />Total Vehicle Cost: 28.00 <br />170.47 <br />Cost <br />18.22 <br />0. 2 <br />18.94 <br />Total cost for work orcier 71G1t96750720: 217.41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.