My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2428 TAYLOR DR 2016-01-01 MF Import
>
Address Records
>
TAYLOR DR
>
2428
>
2428 TAYLOR DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 7:54:26 PM
Creation date
3/10/2017 2:07:55 AM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2428
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5 C�nnect side sewer per City Standard #601. <br />� <br />6. onnect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop dowiispouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspc�t infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width �, Depth Z, Length �.' <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />rauting prior to beginning the project. <br />/11:,Install erosion control measures as determined by the Pubiic Works inspector, such as silt <br />C/ fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per Ciry of Everett Standards for small parcels <br />13 Remove erosion control measures upon completion of the project prior to final approval of the <br />permit. <br />14. Ail excavated materiai from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damagad area must be replaced). <br />�6, Install a Type I concrete driveway per Ciry of Everett Standard #307. <br />i <br />; 17. P ve driveway from the front property line out to the street paving. <br />e. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per Ciry Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />� <br />2t: A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />PWCommems <br />� y�� i��1�1,� /�r�. <br />yZ � <br />
The URL can be used to link to this page
Your browser does not support the video tag.