Laserfiche WebLink
CLOSED CM WORR ORDfiRS REPORT <br />Total Utility Maintenance Management System <br />04/OB/1996 Page 1 <br />Date Range O1/09/1989 - 04/O1/1996 <br />CM Work Order Range :1001091070001 - UT1002- - Pattern :7101196750651 <br />Ztem Range :<Blank> - WW22020001 Pattern :* <br />Progra:n ALL Function ALL Activity ALL <br />-----------------------------------'______________________________________:_____ <br />CM WORK ORDER ID: 7101196750651 Title: REPAIR 2623 TAYLOR DR <br /><cDUPLICATE PRINTING OF THIS WORK ORDER» <br />Item IL: WS3594N001 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date Completed: 03/18/1996 <br />Overall Craft: <br />Issued: 03/18/1996 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />StaY_us: <br />Issued by: WMW Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Lebor: <br />Craft ID Name Planned Hrs Actual Hrs <br />----- ------ ------------------------------ ----------- ---------- <br />UL SSJ SMITH, STEVE J. 0.00 4.00 <br />WST WDT WALDEN, DAROLD T. 0.00 4.00 <br />Materiale: <br />ID <br />ADAP34000547 <br />BOX000056247 <br />COUP34142747 <br />ELL034101447 <br />N/A <br />NIPP34131247 <br />PIPE34060647 <br />SETT34033647 <br />VALV34008348 <br />Vehiclee: <br />ID <br />V2117 <br />Descriptian <br />------------------------------ <br />ADAPTER 3/4" MIP X INSTA-TITE� <br />BOX METER PLA 15" X 10" W/LID <br />COUPLING 3/4" CTS COMP X MIPTO <br />ELL 3/4" 90 DEG BRASS " <br />METER JUMPER (FROM STOCK) <br />NIPPLE 3/4" CLOSE BRASS " <br />PIPE 3/4" POLY I.P.S. <br />SETTER COP 5/8" X 3/4" (H12") <br />VALVE METER 3/4" LOCK WING IP� <br />Description <br />--------- ---- --------------- <br />91 CHEV 1-TON HYD UNIT <br />Total Labor Cost: <br />Date <br />03/10/1996 <br />03/10/1996 <br />03/18/1996 <br />03/18/1996 <br />03/18/1996 <br />03/18/1996 <br />03/18/1996 <br />03/18/1996 <br />03/18/1996 <br /># Used <br />_ 2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />Total Material Cost: <br />Houra Cost <br />4.00 <br />Total Vehicle Cost: <br />--- 22.40 <br />22.40 <br />Coat <br />59.64 <br />79.68 <br />139.32 <br />Cost <br />15.36 <br />12.96 <br />4.15 <br />1.35 <br />0.00 <br />0.79 <br />0.7.6 <br />51.41 <br />16.56 <br />-----=--�� <br />i 102.84 <br />� <br />1'otal cost for work order 7101196750651: 264.56 <br />