My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1025 TEMPLE DR 2016-01-01 MF Import
>
Address Records
>
TEMPLE DR
>
1025
>
1025 TEMPLE DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2017 6:02:35 PM
Creation date
3/10/2017 2:19:11 AM
Metadata
Fields
Template:
Address Document
Street Name
TEMPLE DR
Street Number
1025
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� <br />A�x <br />C H <br />9H�Ctn <br />yxH <br />�H� <br />��9 N'�1 <br />�H <br />��tl <br />OH <br />��g <br />�V � <br />C"y� <br />MH <br />gy <br />��� <br />�o� <br />� <br />V <br />J <br />� <br />DAVID L. NELSON 4ND ASSOCIATES, INC. <br />Consulting Enginccring Gculagl <br />Febzuazy 8, 19°0 <br />Pzo7ect No. 0890 <br />Page 10 <br />Rockecies <br />5ockezies may be used on site but they should 6e consideced on a case-by-case <br />basis. They vill not be suitable for all potential cuts on site. Rackecles <br />pcovide e=osion pcotection fo= existing stable soil conditions; they ace not <br />consideced retaining stcuctuces. ConstLuction of rockecies is an art and <br />should be accomplished by an expecienced tockezy contzactox. The design and <br />constructian should take Into cons[decation site dzalnage and soil conditions. <br />All cockeztes should confocm to guidelines and iequizements peL Ring County. <br />USE OF THIS REPORT AND AARRANTY <br />We have pzepaced this tepozt foc use by Sea Ccest Homes, Inc., and theiL <br />agents fot theiz use ln planning and prelimina:y design of a poztion of this <br />pco7ect. The data and repoZt should 6e pzovided to pxospective contxactocs <br />foz iheir bidding and estimating pucposes, but ouc cepoct conclustons and <br />intecpxetations should not 6e const=ued as a varzanty of subgzade conditions. <br />So[1 and gcound vatec conditions may chanqe betveen explocations and vith ' <br />time. f,ontingencies should be included in the pcoject schedule and budyet :ec <br />these changes. <br />The scope oE ouc vork does not include se=vices related to const:uc�ion safety <br />pzecautio���, and ouz Lecommendations ace not intended to di=ect the <br />contzactci's methods, techniques, sequences or procedutes, except as <br />specifically desc=ibed 1❑ ouz zepoct foc consideration Sn design. Thez= arz <br />possible vaxiations in subsuzface conditions. Final design vas not complete <br />'_1�' at the tlme this Lepoct vas pcepazed. Ne recommend that ve be retained to <br />ceviev final plans includino site topogzaphy infoLmation to deteLmine if the <br />± design is in accocdance vith ouz cecammendations. As pact of ouz se=vices ve <br />L1�i vould ptovide additional cecommendations based on final site gxades. <br />tie Lecommend that the drainage and eaxthvork phase oE development, including <br />excavatian and stLuctuLal Eilling be monitoted by us. Be vould evaluate <br />eazthvock activities to detecmine 1: they comply vlth pcoiect plans and <br />specificatlons, and oux cecommendations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.