My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2820 TERMINAL AVE 2016-01-01 MF Import
>
Address Records
>
TERMINAL AVE
>
2820
>
2820 TERMINAL AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 7:33:00 PM
Creation date
3/10/2017 2:20:06 AM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
2820
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PORT GARDNER TIMBER CO., INC. <br />�a- <br />�.o.�ox i4�s ass•�vev LV[R[TT. WA. ��aoa <br />January 7., 1980 <br />Mr. Ken Callahan <br />Building Director <br />City of Everett <br />City Hall <br />�erett, Washington 98201 <br />Dear Ken: <br />Enclosed is the correction sheet for the planned building that <br />I discussed with you last week. <br />gegarding the ventilation, the building is not open-ended as I <br />described to you, however there is a door plazmed at the "closed" <br />end. <br />If this should not prove satisfactorp to you, an exhaust sYsten <br />Kould be provided. <br />Our major ooncern is the recamiended sanitation facilities. (hu' <br />uc�jacent office building provides thre-a toilet, washraxn facilities. <br />I aould hope that this uould be adeqa�te. <br />If any additional infornation iram us is needed, uould you please <br />call or write me at the enclosed telephone mmiber or address. <br />Yours very trul.y, <br />�,,__ <br />� <br />Earl 'lbrgeson <br />Enclosure <br />UU � � ��� �� � <br />.;i�^� o > , �l <br />��r� cr ;, ,.,� , <br />lnsp��tion �0 p�TT <br />
The URL can be used to link to this page
Your browser does not support the video tag.