My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2920 TERMINAL AVE 2018-01-02 MF Import
>
Address Records
>
TERMINAL AVE
>
2920
>
2920 TERMINAL AVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 10:45:06 AM
Creation date
3/10/2017 3:09:20 AM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
2920
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br />SHORELINE MANAGEMENT ACT OF 1971 <br />PERMIT FOR SHORELME MANAC,EMENT <br />SUBSTANTIAL DEVELOPMENT, CONDITIONAL <br />USE, OR VARIANCE <br />Application No. SMA d6-90 <br />Date received August 30, 1990 <br />Approved X Denied <br />Date December 3, 1990 <br />Type of Action(s) <br />X Substantial Development Permit <br />_ Conditional Use Permit <br />Variance Permit <br />Pursuant to Chapter RCW 90.58, a permit is hereby granted/denied to: <br />Port of Everett <br />same of applicant) <br />P.O. Box 538 <br />address <br />Everett. WA 98206 <br />to undertake the following development: (Please be specific) Replacement of <br />Improvements to Pier 1 of the Everett waterfront including: <br />1. Replacement of the existing wood piling with concrete piling <br />along with concrete decks in place of the existing wood planks; <br />2. An extension of the pier 70 feet to the west and a widening of <br />the south apron by 40 feet. In addition there will 210 feet of <br />bulkhead installed; <br />3. <br />4. <br />5 <br />11 <br />Crane rails on the pier that will be extended to the west <br />approximately 60 feet; <br />Videning of the south apron of the pier that will require the <br />linking of the apron with the upland and necessitate 8,000 cubic <br />yards of fill material being placed to protect the slope; <br />Removal of an existing timber bulkhead and the excavation of <br />approximately 3,000 cubic yards of earth material behind the <br />bulkhead; <br />Removal of a warehouse structure and the replacemen= of a smaller <br />structure in the same area; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.