Laserfiche WebLink
4 <br />(c) Add the Condensate Control Ductwork Detail to sheet <br />M-1. (Exhibit 7c, numbered as sheet 5) <br />16. Sheet E-2: Offices 201, 202, 203, at the south second <br />floor plan. Substitute, in place of 4-30-92 floor plan <br />version the "Revised Electrical Plan" dated 10-22-92, <br />EXHIBITS/DRAWINGS INCLUDED AS PART OF ADDENDUM #2: <br />I. Bid Item Listing., <br />2. Port of Everett "furnished matrials list.,...... „ 2 pages <br />3. Drawing Sheet A-1(10-26-92)...................... 4. Drawing Sheet A-2 (10-26-92).....,,,,, 1 sheet <br />5. Drawings, Details (not used) ..................1 sheet <br />6. Drawing, oor <br />7. Drawings,DMechanicallDetai.................I page <br />Details/Notes/Schedules <br />a. Exhaust Fan Schedule.. <br />b. Condensate Control Ductwork ................... ) page <br />c. Condensate Control Ductwork Detail ............ ' Pages <br />..........1 page <br />8. Drawing, Revised Electrical Plan (10-22-92),,,,,,,1 page <br />Add#2 <br />specifications <br />