My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 TERMINAL AVE 2016-01-01 MF Import
>
Address Records
>
TERMINAL AVE
>
3000
>
3000 TERMINAL AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 3:28:24 AM
Creation date
3/10/2017 3:26:36 AM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
3000
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTTO ROSENAU & ASSOCIATES, INC. <br /> CONSTRUCTION INSPECTION 8 TESTING SrR��rURAL <br /> 6747 M. L. King Way Saulh • Seattle, WA 98118 <br /> �S.A•Y•E.i p�o�o �, <br /> (206) 7254600 • Tacoma 627�4477 • Faz(206) 723•2221 `J 5�"` <br /> E%AI.��N <br /> 4TION <br /> INSPECTION OF PILE DRIVING <br /> PRCIIEGT: Dunlap Tawing - Maritime PERMIT NUMBER: 26623 <br /> ADDRESS: 2830 Terminal Avenue, Port of Everett JOB NUMBER: 91-153 <br /> ARCHITECf: ENG�NEER: <br /> COMRACfOR: Hurlen Construc[ion INSPEGTED AT• Job Site <br /> INSPECfOR <br /> AND DATE INSPECfOR'S REMARKS <br /> D. Newman Two backhoe test pits were dug to reveal subsurface ccnditions. The site <br /> 6-4-91 is built on a well-compacted fill consis[ing of a conglomerate of materials. <br /> The backnoe encoun[ered dense rubble, clay and rip-rap in the 2nd pit and <br /> stooped. A test pile was driven to refusal at 4' and then moved a foot <br /> laterally where the pile buckled at 2}' . A new test pile was driven in <br /> a location 25' East of lli and penetrated 3}' before s[opping. A 3rd test <br /> pile was driven at the bot[om of test pi[ lil to a depth of 26}' . <br /> The pile driving sub and Ken of Duniap Towing decided [o suspend pile <br /> driving until further consulta[ion could be made with regard to the <br /> fuundation plan. A location survey of underground utilities should be <br /> made. It is recommended that a soil survey be made by a Geotechnical <br /> Engineer or another suitable substitute be made for the piling. <br /> ------------------------------------------------------------------------------------------------ <br /> This report is tl�e exclusive property of our firm for use in producing <br /> a final report L'o obtai❑ a Certificate of Occupancy. Use oE this <br /> cc: IOwner report by any other firm i� strictly prohibited without written pernission <br /> Architec� from our firm. This report may be a matt�r of public record at government <br /> agencies etc. , Uut it is public record for vie�oing onl��, not for personal <br /> Engineer or fin:�ncial <br /> 1-Cuniractor ��11�' <br /> t-�Idc�. Depl. <br />
The URL can be used to link to this page
Your browser does not support the video tag.