Laserfiche WebLink
. ,--, ,•-. �� <br /> PUBLIC WORKS D PE ARTMENT <br /> UTILITIES DIVISION <br /> COST ESTIMATE BHEET 2300 CEDAR STREET <br /> E�'ERETT, WASHINGTON 98201 <br /> (206) 259-8800 <br /> Receipt # y y7 �Z Date Paid ���/9/ <br /> _� Cost of Work Order $ 3 ,958 Work Order ,� <br /> Cost of Service Order $ Service order � <br /> Contact Person• Telephone f _ <br /> Requested By: Kirk Brooks Date of Request <br /> Property Owner (name) Port of Everett <br /> Charge Cost to (name if different than owner) Dunlan Towina Companv <br /> Address P•0, �ox 593 City LaConner. WA Zip 98257 <br /> installation Location New Barker site at Bav Front <br /> installation type/description/size/etc. Excavate make one hot tap two <br /> f�nal hookubs and restore area _ _ <br /> [X] The following estimate is based upon the IItilities Division <br /> providing all labor, equipment, materials, restoration, and final <br /> hook-up. <br /> [ ] The following estimate is based upon the Street Division work group <br /> providing all labor, equipment, materials and restoration to <br /> property. <br /> Whenever the eetimated cost is not eufficient to cover the total expenee for labor, <br /> material, equipment rental and administrative coste, the deficit ehnll be charqed to <br /> the property for which euch installation was made and the owner thereof� and provided <br /> further, that any exceee payment ehall be returned to tha pereon npplyinq for the <br /> inetallation. <br /> itemized Coat Eatimate: <br /> Labor & Overhead 1344 cc: Charyl Fon�sine <br /> Clair Olivere <br /> Material 2014 Tom Thetfot'd <br /> Don Weitkam!� <br /> Equipment Rental 500 Kirk Brooka <br /> Gordon Witcher <br /> Surface Restoration 100 0. �on wahl <br /> Dan Lowell <br /> Total -3958 Stan Mitchell <br /> �� � <br /> Prepared by ' - ����-{� <br /> Accepted by Representing <br />