Laserfiche WebLink
. �. <br /> PORT OF EVERETT <br /> SOUTH TERMINAL DEVELOPMENT <br /> LOG HANDLING FAC:ILITY <br /> PHASE t <br /> Contract No. E-01-88 <br /> ADDENDUM #t <br /> July 15, 1988 <br /> DRAWINGS <br /> Sheet C-4 Revise teTporary roatl location to match amended <br /> sheet C-5 (attached) . <br /> Sheet C-5: Add approximately 400' of temporary road. <br /> Sheet C-6: Delete 2'-0" tlimension on tletail 1 between oil <br /> separator catch basin and standartl catch basin <br /> Type II <br /> Sheet C-70: Add one air release valve antl chamber. <br /> Drawing changes to sheets C-5 and C-70 have been matle. <br /> /�\ I <br /> v <br />