Laserfiche WebLink
APPENDIX C <br />REPORT LIMITATIONS AND GUIDELINES FOR USE' <br />This appendix provides information to help you manage your risks with respect to the use of this <br />report. <br />GEOTECHNICAL SERVICES ARE PERFORMED FOR SPECIFIC PURPOSES, <br />PERSONS AND PROJECTS <br />This report has been prepared for use by Everett Community College, LMN \rchitects, and members <br />of the design team for use in the design of this project. This report may be made available to prospective <br />contractors for bidding or estimating purposes; but our report, conclusions and interpretations should not <br />be construed as a warranty of the subsurface conditions. This report is not intended for use by others, and <br />the information contained herein is not applicable to other sites. <br />GeoEngineers structures our services to meet the specific needs of our clients. For example, a <br />gcotcchnical or geologic study conducted for a civil engineer or architect may not fulfill the needs of a <br />construction contractor or even another civil engineer or architect that are involved in the same project. <br />Because each gcotcchnical or geologic study is unique, each geotcchnical engineering or geologic report <br />is unique, prepared solely for the specific client and project site. No one except Everett Community <br />College, LMN Architects, and members of the design team should rely on this report without first <br />conferring with GeoEngineers. This report should not be applied for any purpose or project except the <br />one originally contemplated. <br />A GEOTECHNICAL ENGINEERING OR GEOLOGIC REPORT IS BASED ON A UNIQUE <br />SET OF PROJECT -SPECIFIC FACTORS <br />This report has been prepared for the proposed Art and Science building that will be located on the <br />Everett Community College campus in Everett, Washington. GeoEngineers considered a number of <br />unique, project -specific factors when establishing the scope of services for this project and report. Unless <br />GeoEngineers specifically indicates otherwise, do not rely on this report if it was: <br />• not prepared for you, <br />• not prepared for your project, <br />• not prepared for the specific site explored, or <br />• completed before important project changes were made. <br />For example, changes that can affect the applicability of this report include those that affect: <br />• the function of the proposed structure; <br />• elevation, configuration, location, orientation or weight of the proposed structure; <br />• composition of the design team; or <br />• project ownership. <br />Developed based on material provided by ASH, Professional Finns Practicing in the Geoseiences; www.asfe.org . & <br />G c o E n g i n e c r s C-1 File No. 5836-002-0O1040204 <br />