Laserfiche WebLink
Project Info <br />' <br />Project Address Lvenatt co®unfey coueye <br />Date 4/1/2005 <br />2000 To. r street 1206 Olympus Hall) <br />For Building Dept. Use <br />Evermtt M 99201 <br />Applicant Name: Wchael Kerns <br />Applicant Address: same as above <br />Applicant Phone 425-396-9253 <br />Project Description <br />Briefly describe mechanical <br />system type and features. <br />l Includes Plans Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 <br />O Simple System * Complex System O Systems Analysis <br />Compliance Option (See Decision Flowchart (over) for qualifications. Use separate MECH-SUM for simple 8 complex systems) <br />Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the <br />plans. For projects without plans, fill in the required information below. <br />Cooling Equipment Schedule <br />quip. <br />C:.paaty' <br />OSA CFM <br />SEER <br />ID <br />Brand Name' <br />Model No.' <br />3lud1 <br />Total CFM <br />or Econo? <br />or EER <br />IPLVI <br />Location <br />I-1 <br />MMAIR <br />C511-38K-RCS105❑ <br />1152000 <br />38000 <br />Econo <br />9.80 <br />12.70 <br />Roof <br />-2 <br />HURTAIR <br />C5U-30K-RC$125C <br />1365000 <br />45700 <br />Econo <br />9.80 <br />12.40 <br />Roof <br />1-3 <br />HU"MR <br />CSU-27K-RCS090C <br />975000 <br />23800 <br />23800 <br />10.10 <br />12.00 <br />Roof <br />MTSURISIII <br />MOM / 1N09TW <br />8800 <br />300 <br />NONE <br />9.00 <br />/ <br />oul <br />R000f112 <br />MTSUFISHI <br />HI;09TU / Hu09TW <br />8900 <br />300 <br />NONE <br />9.00 <br />lDof230 / <br />0U2 <br />foorf 330 / <br />,u3 <br />11ITSURISHS <br />H509N / 1N09TW <br />8800 <br />300 <br />NONE <br />9.00 <br />MTSMISHI <br />M509N / M09TW <br />8800 <br />300 <br />NONE <br />9.00 <br />wof265 / <br />oV< <br />IU5 <br />mrs <br />MTSUUISHT <br />MOM / 1N09T14 <br />8300 <br />300 <br />NONE <br />9.00 <br />lmr 356 / <br />Roof <br />Fan Equipment Schedule <br />Equip. <br />ID <br />Brand Name' <br />Model No <br />CFM <br />Sp' <br />HP/BHP <br />Flow Control' <br />Location of Service <br />EF-1 <br />Greenheck <br />MQ-336 <br />24500 <br />3.00 <br />25/20.5 <br />N <br />Roof <br />EF-2 <br />Greenheck <br />s0-336 <br />24500 <br />3.00 <br />25/20.5 <br />cv <br />Roof <br />EF-3 <br />Greenheck <br />CUBE-300 <br />7310 <br />1.00 <br />3/2.05 <br />N <br />Roof <br />EF-4 <br />Greenheck <br />NRE-160 <br />-1375 <br />1.25 <br />1/0.82 <br />CV <br />Roof <br />I <br />