My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST ARTS AND SCIENCES BLDG 2018-01-02 MF Import
>
Address Records
>
TOWER ST
>
2000
>
ARTS AND SCIENCES BLDG
>
2000 TOWER ST ARTS AND SCIENCES BLDG 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 11:01:19 AM
Creation date
3/10/2017 5:20:51 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
ARTS AND SCIENCES BLDG
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Receipt # <br />Contact Person <br />Requested By <br />Cost of Work Order <br />Cost of Service Order <br />Larry Price <br />Paul McKee <br />Pue Di Wotu6 D00 Cedar <br />St ; <br />Udlitles Division, 3200 Cedar Str��e//eJJt22 <br />Eve �VLI0 <br />4 <br />OCT 0 3 2005 <br />Date Paid Z4 ///q <br />T <br />1OF EVERETT Work Order# _ <br />EngmeeringlPubn, Seivic�ervice Order # <br />Property Owner (name) Everett Community College <br />Charge Cost to (name if different than owner) <br />Telephone # 426 388-9613 <br />Date of Request 9-29-06 <br />Address 2000 Tower St City Everett Zip 98201-1390 <br />Installation Location 2000 Tower St <br />Installation type/description/size/etc. #1- 8" connection. Cut existing main, install valve and elbow, <br />Connect to contractor installed pipe after purity. Contractor to expose, shore, restore. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returnee to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3" AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benctits <br />equipment Rental <br />Tax <br />TOTAL <br />857.00 <br />558.00 <br />172.00 <br />28.00 <br />$1,615.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Hatt Welborn <br />Paul McKee <br />Gerry Crum <br />Dennis Roberson <br />Prepared by: Gerry, Crum,/ ate Estimate Prepared 9-29-05 <br />Accepted by: <br />Representing <br />ESTINIATE GOOD FOR 6 NIONTHS <br />S NYC ..kWiarc.N.6roc.n collet, WC I of_6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.