Laserfiche WebLink
( e WORKS DEPARTMENT <br />Jtilties Division, 3200 Cedar treet <br />Everett WA 98201 <br />425-257-M <br />Receipt # Date Paid <br />J Cost of Work Order 2,500.00 Work Order# <br />Cost of Service Order Service Order # <br />Contact Person Larry Price Telephone # 425 388-9513 <br />Requested By Paul McKee Date of Request 9.29-05 <br />Property Owner (name) Everett Community College <br />Charge Cost to (name if different than owner) <br />Address 2000 Tower St City Everett Zip 98201-1390 <br />Installation Location 2000 Tower St <br />Installation type/description/size/etc. #3- relocate existing hydrant north. Contractor to expose, <br />shore, restore. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER i11ETERS P AND LARGER MAYHAVE A SIX TO 10 WEEK LEAD TIME <br />Material <br />Labor and 13enelits <br />Equipment Rental <br />Tax <br />TOTAL <br />1,004.00 <br />1,045.00 <br />408.00 <br />43.00 <br />$2,600.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Robert Waddle <br />Matt Welborn <br />Paul McKee <br />Gerry Crum <br />Dennis Roberson <br />Prepared by: Gerry Crum Date Estimate Prepared 9-29-05 <br />Accepted by: <br />Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />SLL'CommontlniaUCope"T'lcommCoO,' DOC 3 of 6 <br />