Laserfiche WebLink
Dates) <br />03/12/04 <br />6� <br />LCB <br />Cheded <br />9 <br />RCM <br />coring <br />Holt Drilling <br />Drill <br />Hollow -stem Auger <br />�`re <br />SPT <br />Auger <br />4" ID <br />ner <br />o <br />140 (Ib) hammer/ 30 (in) drop <br />a'fuw <br />Mobile B-59 Truck Mount <br />Data <br />t <br />Total <br />25.9 <br />sunam <br />119.5 <br />Gnwndwter <br />None observed <br />Depth IS) <br />Elevation (h) <br />Level(II togs) <br />Datum <br />baton <br />Southwest Comer <br />System <br />SAMPLES <br />a <br />MATERIAL DESCRIPTION <br />of <br />OTHER TESTS <br />£ <br />d <br />o <br />.� <br />AND NOTES <br />W� <br />o� <br />d .. <br />2� <br />°r <br />2 <br />rm <br />f,P 5 to 6 inches of hasr < <br />Sit Drown silty fine sanJ <br />dense, moist) <br />Grades to gray -brown <br />1 1 151 S49" <br />5 <br />2 IA GI <br />Shght plasncily. <br />3 IS 38 <br />10 <br />10 <br />4 16 78110" <br />00 <br />151j 5 11115(1.4,I II I II r MIWironoxide staining <br />6 1 101 51) 4" <br />Sec Figure A-2 for caplanatiun of symbols <br />9 <br />13 <br />LOG OF BORING B-3 <br />$ Project: Proposed Art and Science Building <br />G EO E N G I N E E R S Project Location: Everett Community College Uigure: A-5 <br />m Project Number: 5836-002-00 Sheet 1 of <br />