My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST GRAY WOLF HALL 2018-01-01 MF Import
>
Address Records
>
TOWER ST
>
2000
>
GRAY WOLF HALL
>
2000 TOWER ST GRAY WOLF HALL 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 1:11:31 PM
Creation date
3/10/2017 5:29:09 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
GRAY WOLF HALL
Notes
UNDERGRADUATE EDUCATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(:vcreu Comnwnitv Cullcec <br /> Novcmbcrld. '-OU3 <br /> Paec '_ <br /> FOOTING SUBGRADE PREPARATION <br /> \1'c obsc�cd prcpan�ion uf Ihc foutinc subg�:idc soils for thc Undcrgr:iduatc Gducation Ccntcr. <br /> Obscrvaiions of Ibuting subgradc conditiuns wcre madc to vcrify ihc rccommcndcd allo�cable bcaring <br /> pressurc o(6,000 psi lor dcnsc, unJisturbcd, glacial soils and 3,000 psf for stnictur;�l till uvcr undisturbcd <br /> dentic glacial soils. Our obscrva�ions of fooung subgradc soil prcparation occurccd bchvccn Octobcr I I <br /> ;md No�-cmber 2Q 2007. in gencral, the 1'ooting subgrade soils consist of densc silt}' sand with gra�el <br /> (glocial lill), hard glacial silt, or suiictural Iill ovcd�•ing thc nati�c gL•ici;�l suils. SubgraJe soils �vcrc <br /> cvaluatcd �vi�h a !iz-inch diamcter stccl probc rod and/or by per(om�ing iu-placc nudcar moisturc anJ <br /> dcnsiry tcsis. SubgraJc arcas Ihat rcquircJ rcmoval of unsuitablc suils wcrc occrexcavated anJ backfillcd <br /> wilh cuncretc or conlrollcd Jcnsity fill (CD�}. ln our opinion. Ihc fouting subgradcs wcrc adcyuatcly <br /> prcpareJ, and �vhcrc nceded, concrcte or CDF placed i�clow footings was ;iJcyu;ucly placeJ anJ is <br /> salisl:ictory for the Jcsign bcaring capacitics prescntcd in Ihc gcolcchnical rcpon. <br /> PLACEMENT AND COMPACTION OF STRUCTURAL FILL <br /> Nc obscrvcd cxcavatiun anJ pl:iccntcnt of struc�ural fill in tmd around thc building un an intcnnittcnt <br /> basis bctwecn Junc 7, 20U7 and Ociobcr 22, 2008. Fill pL•iccd wilhin thc building arca includcd stnut:�ral <br /> lill for foo�ing, wall, and (loor slab suppurt, and backfill around tlic footings, walls, and cicwUor sha�i. <br /> '1'his aclivity includcd cvalualing importcd lill yuality by complcting laboratory sic��c analyscs ;md <br /> Pructor tes�s(maxinmm Jry dcnsity Jetenninations). The impuned fill gcnerally consists of sand with sih <br /> and gravcl (gravd borrow). On-sitc silty sand with gravel (glacial till) �vas also uscd for slruc�ural fill. <br /> l'hc slniclur;d fill was cvalualcd by complcting in-pl:icc moislurc and dcnsiry tcsts and by probing with a <br /> '/,-inch-Jiamctcr stccl pmbc rod. 13ascd on thc tcst resuhs :md our obscrvaiions, stniciural fill placcd in <br /> lhc building (ootprinl was compactcd to n� Ir,�s� 95 perccnl of thc �1D17 per ASl'�I D 1557. 13ackfill <br /> consisling of importcd gravcl bon'ow or suitablc onsitc glaci:d till pl.icecl outsidc thc building was <br /> compuctcd to at Icast 95 percent of thc MDU per ASTM D 1557 in thc upper 2 fcct, and to at Icast <br /> 90 percent MDD bclow ihe top Z CecL In aur opinion, the strucmral fill placed :md cv:dualed during our <br /> sitc visits wns compactcd according io thc projcct plans and specifications and our rccommcnJations. <br /> PAVEMENT SUBGRADE EVALUATION <br /> N'c evalualcd lhc paventcnl subgrade soils for road, parking lot, dumpstcr pad, hardscape, sidcwalk, and <br /> curb arcas on an intennittcnt basis bcnvccn August 27 anJ Novcmbcr 10, 2008. Thc subgndc soils ��•crc <br /> cv:duatcd with a '/z-incli diamctcr stccl probc rod and/or by prooGrolling with on-si�c cquipment. <br /> SubgraJc arcas that rcquired o��crcxcavation of sofl soils wcrc backtillcd �vith structural fill. Thc <br /> stnictural fill was evaluateJ with in-place moisuire :md density tcsts ancUor by probing. l3ased on Ihe tcst <br /> raults and our obscrvalions, thc swctuml fill �vas compacicd to at Icast 95 perccnt of ihc MDD per <br /> ASTM D 1557. In our opinion, bascd on our obscrvations thc pavcmcnt subgradc for thc siJc�valks and <br /> asphalt pavcmcnt wcrc prcpared in gcncral accord;mcc with thc projcct plans, spccificalions and our <br /> recomtncndations. <br /> ON-GRADE FLOOR SLAB SUOGRADE PREPARATION <br /> �Vc obscrved placcmcnt of structural fill and prcparatiun of omgradc Ooor slab subgradc soils for thc <br /> projcct prior to anJ aRcr placcmcm of thc cnpillary brcak maicrial. Our obscrvations mgarding on-gradc <br /> Iloor slab subgradc soils ��•cre madc bchvccn August 3, 2007 anJ January 3, 2008. Tlic on•graJc �loor <br /> slab subgradc suils consistcd of Jcnsc to vcry Jr.nsc silty sand with gravel (glacial till), hard glacial silt, <br /> �md impu�tcd and on-sitc xtruc�ur�l fill, which wcrc ct�nluatcd 6y cithcr performing in-placc moisture and <br /> dcnsity icsts, probing wi�h ;i ';:-inch-diamcicr stccl probc rod, or by proof-rolling with on-sitc cyuipment. <br /> PJo,�'�� svtG-nq�_U/ GEOENGItlE[N5� �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.