My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST RAINIER HALL 2018-01-01 MF Import
>
Address Records
>
TOWER ST
>
2000
>
RAINIER HALL
>
2000 TOWER ST RAINIER HALL 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2019 11:28:10 AM
Creation date
3/10/2017 5:48:18 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
RAINIER HALL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
243
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CL08ED CM 1fOR1C ORDERS RSpORT <br /> Total Utility Maintenance Management System �gN-Q.� SOcC <br /> _ 04/22/1997 Page 1 <br /> =�f===�=__==:�:s_______________---------- <br /> ----- _________________________________________________ <br /> Date Ranqe :O1/09/1989 - 04/O1/1997 <br /> CM Work Order Ranqe :1001091070001 - 740119677p910Pattern :5201196760002 <br /> Item Ranqe :<Blank> - WVL3694L05 Pattern :* <br /> Proqram ALL Function ALL Activity ALL <br />', =�:::a=��==n=s=====___�----- <br /> �____esxzveee=aaecc'e_eo=o=cecveec-----'- <br /> i CM WORK ORDER ID: 520119676C002 Title: REpLACE 801 WETMORE A�IE <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS1895A077 -- WATER SERVICE <br /> Locat:on ID: -- <br /> Program 520 Function 119 Activity 676 <br /> Date Completed: 03/28/1997 <br /> Overall Craft: <br /> Issued: 03/25/1997 Issued by: RTW Assi ne <br /> Out of Service? NO Priorit 4 d to: <br /> Meter Reading: Y' Travel Time: 0. 00 Hr. <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Crsft ID Name Planned Hrs Actual Hrs Cost <br /> ---- ------ ------------------------------ <br /> -------o-oo ------3.00 -----57.45 <br /> WST BBA BRADLEY, BROCK A. <br /> UL DMJ pOUCETTE, MAgK J 0.00 11.00 173.58 <br /> SUP2 GJ GARZA, �TOHN (NMI) 0.00 7.00 180.95 <br /> UL Mb[E MURRpy, M,qTHEW E. 0. 00 8.00 102.6G <br /> EO PTN PINON, THOMAS N. 0.00 11. 00 215.38 <br /> NEO WMF WELIMAN, MARK F. 0.00 3.00 60.69 <br /> Total Labor Cost: 790.69 <br /> Kai�rfalss <br /> ZD Description Date $ Used Cost <br /> ------------ -"-------------- <br /> -------------- -------- <br /> METE44125447 METER 6" NEPTUNE PROTECTUS 111 03/26/1997 1 6509 80 <br /> N/A 6 FLANGE KIT 03/06/1997 2 12.46 <br /> Total Material Cost: 6522.26 <br /> V�hicl�s: y� <br /> I� Description Hours Cost �OSG9.�C ,', <br /> ---------- --------------------- <br /> --------- ------ ------ <br /> V0017 94 FORD AEROSTAR VAN 7.00 40 60 <br /> V2137 84 GMC BOOM TRUCK 5 TON 3.00 63. 60 <br /> V2134 86 CHEV 1-TON W/HYD. UNIT 8.00 38.40 <br /> V2150 87 FORD 2 TON W/CRANE 8. 00 47.20 <br /> V2156 89 DODGE 1 TON 3. 00 15.30 <br /> VJ0010 95 INTERNATIONAL BOOM TRUCK 2 .00 gg,gp <br /> Total Vehicle Cost: 293. 90 <br /> aork Description: <br /> ----------------------------------------------------------- <br />
The URL can be used to link to this page
Your browser does not support the video tag.