My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6230 SPRING ST A&B 2016-01-01 MF Import
>
Address Records
>
SPRING ST
>
6230
>
6230 SPRING ST A&B 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2017 5:47:01 PM
Creation date
3/10/2017 6:09:48 AM
Metadata
Fields
Template:
Address Document
Street Name
SPRING ST
Street Number
6230
Unit
A&B
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 CONCLUSIONS AND RECUMMENDATIONS <br />Our exploration indicetes that Erom e qeotechnicel etendpoint, the <br />parcel ia euiteble tor the proponed development provided''the <br />recommendatione conteined herain ere properly followed. The denee <br />to very denee till encountered in the exploration pite end obeerved <br />in-plece elong the weetern edge oE the excavetions Mill provide <br />euitable beerinq aupport ior the rock mate. Spread Eootinqa, as <br />plenned, may be uaed for buildinq aupport Eor the proposed duplex <br />epertment etructurea Nhen placed over properly conatru�ted rock <br />meta. . <br />In order to reduce the riek oE eettlement we recommend that the <br />surlicinl eilt end aend �:►�ich baa eccumulated on tep ot the rock <br />Mets be removed prior to piaaement o[ additiort5l 4'co 6 inch querry <br />epells. It ie eupqested thet removel of t;:e aurticial ailt end <br />•end be eccompliehed by usinq e treckhoe (Mith the teeth coveced) to <br />ecrape the msterial of[ of the underlyinq rock. NeN rock ehould <br />then be pleced in 1 foot lifte end compected up �o en elevation et <br />leeet 6 inchee ebove the hiqheet expected Natur level within the <br />buildiny ereee. The querry epelle mey lhen be capped with e leyer <br />ot 9 minue inch cruehed querry rock to ect es e leveliny couree. <br />The qusrry epelle end cruahed rock munt be rolled Nith e compecter <br />to echieve e tightly pecked maee. Stayinq ezeee ehould be <br />�einteined eo that the rock is not contemineted by mud prior to <br />plecement in the excevetion. I.E deeired for subalab preperetion, <br />compected, cleen eand may be pleced on top ot the cruahed 7 minua <br />inch querry rock. <br />Re ere evailable to provide monitoring servicee during co�struction. <br />The inteqrity ot the foundaEion depende on proper aile preparation <br />end� conetruction proceduree. He recommend that the followinp <br />inepectiona be performed by e qeotechnical enyineer/enqineerinq <br />yeoloyiet Irom our tirm ea conatruction precedea. <br />1) Eo1loMing removel oE the eccumulated ai1C end sand layer <br />Mhich currently covere the in-plece rock. <br />7) A representative ahould obaerve the recompection oE the top oE <br />the exietiny rock mat prior to placement oE new rock. <br />J) A representative ahould observe the compaction of the new rock <br />to verify that it i� in e tiqhtly pecked condition. <br />�4). Prior to backfilling, the drei�aye pipe for the rock met <br />should be observed. <br />5) Additionally, we recommend that footing inspectione be per- <br />formed prior to pouring concrete, to veriEy thet rock hae not <br />been diaturbed end dreinaqe ie mainteined. <br />11s. previouely noted, the planned draioepe plena Eor th• rock mat• <br />con�l�l�d o[ pr�vity dr�in�p• o!!�!t• vl• !h• •xi�linp ds�ln�q� <br />d!lah��. Dr�in�p• trom th• tock met� to tha dischecqe poinE ehoUld <br />.t <br />
The URL can be used to link to this page
Your browser does not support the video tag.