My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/04/11 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/04/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 8:17:09 AM
Creation date
3/10/2017 8:16:46 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/11/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 4 <br /> Change Order# 3 with Tastad Consent COUNCIL BILL# <br /> Construction for Garfield Park X Action Originating Department Parks <br /> Playground and Perimeter First Reading Contact Person Jonna Court <br /> Improvements Second Reading Phone Number 257-8344 <br /> Third Reading FOR AGENDA OF April 11,2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> Garfield Park located at Council approval of Change Order Number 3 Administration <br /> 2300 Walnut Street Change Order Number 2 Parks <br /> on January 31, 2007 <br /> Expenditure Required $6,860.44+ WSST Account Number 354 5000000029 650 <br /> Amount Budgeted $ 6,860.44+ WSST Account Number 354 5000000029 650 <br /> Additional Required $ 0 <br /> DETAILED SUMMARY STATEMENT: <br /> Garfield Park playground and perimeter construction improvements are complete. Final inspection occurred <br /> on March 30, 2007. Change Order# 3 is a close out change order. It consists of the following: (1) <br /> improvement to surface water drainage through the provision of an ADA ramp cut into a curb and an <br /> additional ADA parking stall adjacent to the new ramp; and (2) discovery and removal of additional <br /> abandoned drain lines including soil excavation and clean fill importation. Cost of this change order is <br /> $6,860.44 plus Washington State Sales Tax. Funds are available within the approved project budget. <br /> RECOMMENDATION (Exact action requested of Council): Authorize the Mayor to sign <br /> Change Order# 3 in the amount of$6,860.44, plus Washington State Sales Tax, for the Garfield Park <br /> Playground and Perimeter Improvements project. <br /> I0 <br /> C:\Documents and Settings\SuClark\Local Settings\Temporary Internet Files\OLK7D\CS Cover Sheet-Garfield Change Order#3 revised 4-2-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.