Laserfiche WebLink
Tastad Construction Inc. - 10615 180th St SE - Sncn( mish, WA 98296- (425) 760-9221 - Fax(360)668-9148 <br /> 'AY REQUISITION #7 FINAL PAY REQUEST `r` <br /> JOB NUMBER: TO: Everett Parks& Recreation <br /> JOB NAME: Garfield Park Improvements 802 E Mukilteo Blvd <br /> /ORK COMPLETED AS OF: 4/18/2007 Everett,WA 98203 <br /> EM ITEM CONTRACT UNIT TOTAL PREVIOUS BILLINGS THIS REQUISITION TO DATE PERCENT <br /> 10. DESCRIPTION QUANTITY PRICE AMOUNT QUANTITY AMOUNT QUANTITY_ AMOUNT QUANTITY AMOUNT COMP <br /> 1 Mobilization 1.00 ea 30000.00 30,000.00 1.00 30,000.00 1.00 30,000.00 100.00% <br /> 2 Erosion Control 1.00 Is 3000.00 3,000.00 1.00 3,000.00 1.00 3,000.00 100.00% <br /> 3 Site Security 1.00 Is 10500.00 10,500.00 1.00 10,500.00 1.00 10,500.00 100.00% <br /> 4 Traffic Control 1.00 ea 6000.00 6,000.00 1.00 6,000.00 1.00 6,000.00 100.00% <br /> 5 Demolition & Haul 1.00 ea 40625.00 40,625.00 1.00 40,625.00 1.00 40,625.00 100.00% <br /> 6 Excavation/Backfill 1.00 ea 12500.00 12,500.00 1.00 12,500.00 1.00 12,500.00 100.00% <br /> 7 Strip Sod & Haul 1.00 ea 4000.00 4,000.00 1.00 4,000.00 1.00 4,000.00 100.00% <br /> 8 Fine Grading 1.00 ea 8000.00 8,000.00 1.00 8,000.00 1.00 8,000.00 100.00% <br /> 9 Drainage 1.00 ea 3600.00 3,600.00 1.00 3,600.00 1.00 3,600.00 100.00% <br /> 10 Site Furnishings 1.00 ea 21000.00 21,000.00 1.00 21,000.00 1.00 21,000.00 100.00% <br /> 11 Concrete 1.00 ea 96200.00 96,200.00 1.00 96,200.00 1.00 96,200.00 100.00% <br /> 12 Masonry 1.00 ea 58075.00 58,075.00 1.00 58,075.00 1.00 58,075.00 100.00% <br /> 13 Fencing 1.00 ea 30100.00 30,100.00 1.00 30,100.00 1.00 30,100.00 100.00% <br /> 14 Paving 1.00 ea 32000.00 32,000.00 1.00 32,000.00 1.00 32,000.00 100.00% <br /> 15 Striping 1.00 ea 2400.00 2,400.00 1.00 2,400.00 1.00 2,400.00 100.00% <br /> 16 Site Restoration 1.00 ea 10000.00 10,000.00 1.00 10,000.00 1.00 10,000.00 100.00% <br /> CONTRACT SUB-TOTALS: 368,000.00 368,000.00 368,000.00 <br /> Garfield Paybook Page 1 of 2 <br />