My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/04/25 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/04/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 8:45:05 AM
Creation date
3/10/2017 8:44:16 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/25/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• x.44;41a,44 <br /> *,ke,c-vx-attekVki , t5t:i't'sql~.:4VM:Wx-"0"-ittlt 4 `',1‘V-:N'4, (o• <br /> i-EVRRIF;iriNCIMIVO)VIMVIVAPADrkt inFIEAKtOML-$00t3r, <br /> PROJECT TITLE: <br /> Authorize a Call for X Consent COUNCIL BILL# <br /> Construction Bids for Action Originating Department Transportation Services <br /> the North Everett First Reading Contact Person Tom Hingson/Richard Tarry <br /> Transit Center Second Reading Phone Number 257-8939/257-8915 <br /> Third Reading FOR AGENDA OF April 25, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Head a em <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Broadway Ave. area near Council Approval of Legal <br /> Everett Community Professional Services <br /> College Agreement with INCA <br /> Engineers,Inc <br /> 3/2/05 <br /> Amendment No.4 Final <br /> Design <br /> 9/27/06 <br /> Budget Committee <br /> 4/11/07 <br /> Amount Budgeted -0- <br /> Expenditure Required -0- Account Number(s): <br /> Budget Remaining -0- <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: The North Everett Transit Center(NETC) Project is a joint <br /> venture between the City of Everett and Sound Transit (ST). This project was first presented to the Budget <br /> . Committee on August 3, 2004. <br /> On March 2, 2005, Council authorized INCA Engineering Inc. to take the project through the environmental <br /> process and with a subsequent amendment, to final design. Everett Transit has purchased three properties <br /> necessary for the project on Broadway Avenue and the City has agreed to vacate Waverly in exchange for <br /> two additional properties in the footprint of the project. <br /> INCA has completed the 100% design documents and the project is ready to advance to the construction <br /> phase. The NETC is projected to be completed by January 31, 2008. <br /> RECOMMENDATION: Authorize a Call for Construction Bids for the North Everett Transit Center <br /> Al 111h042507 NETC13111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.