My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/05/16 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/05/16 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 9:41:59 AM
Creation date
3/10/2017 9:41:17 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/16/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
computation of predetermined 17. Other project related costs include <br /> percentage rates to be applied to current <br /> labor costs must be based on the average • Competitive Bidding. <br /> of total employee benefits and total • Audit. <br /> labor costs for the prior fiscal year and • Insurance. <br /> adjusted by known current year • Prevailing wages. <br /> variations. • Attorney fees. <br /> • Environmental Review. <br /> c. Other than work identified in Number <br /> • Archaeological Survey. <br /> 11.a,no costs associated with labor <br /> performed by the borrower's employees, It is important to note that the repayment period <br /> including force account work, are for all loans is 20 years or the life expectancy of <br /> eligible for financing assistance. the project,whichever is less. <br /> 12. Contract engineering,planning,design, Projects may be designed to accommodate <br /> legal, and financial planning services.The reasonable growth.This is generally the 20-year <br /> Board reserves the right to declare ineligible projection included in the system's water system <br /> legal costs that are unreasonable and plan or small water system management <br /> disproportionate to the project. <br /> program. <br /> 13. Contract construction work. <br /> 14. Direct vehicle and equipment charges at the <br /> actual rental cost paid for the equipment or, <br /> in the case of city or county-owned <br /> equipment,at the rental rates established by <br /> the local government's"equipment rental <br /> and revolving fund" following the methods <br /> prescribed by the division of municipal <br /> corporations.However, such costs must be <br /> charged on a uniform basis to equipment <br /> used for all projects regardless of the source <br /> of funding. Cities with a population of eight <br /> thousand or less not using this type of fund <br /> are allowed the same rates as used by the <br /> State Department of Transportation. <br /> 15. Direct materials and supplies. <br /> 16. Other direct costs incurred for materials or <br /> services acquired for a specific project are <br /> eligible costs and may include,but are not <br /> limited to such items as: <br /> a. Telephone charges. <br /> b. Reproduction and photogrammetry <br /> costs. <br /> c. Video and photography for project <br /> documentation. <br /> d. Computer usage. <br /> e. Printing and advertising. <br /> 1`' n <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.