My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
811 33RD ST 2017-07-28
>
Address Records
>
33RD ST
>
811
>
811 33RD ST 2017-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2017 7:46:28 AM
Creation date
3/10/2017 9:56:10 AM
Metadata
Fields
Template:
Address Document
Street Name
33RD ST
Street Number
811
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ' PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard #601. <br /> 5. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. ' Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br /> more details. <br /> V') The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Randy Allen at 425-339-7403 // Call Cliff Lindman at 425-339-7404. <br /> CO) <br /> Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> gi. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted <br /> site. No wasting of material is allowed on this building lot. <br /> /?fig. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> �: . No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> ri open for pedestrian travel. <br /> 16. Adjust water meter box 1" above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A & 306 on <br /> this proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 719/ Pave driveway .•• •- . . . ••-- ' .ne •- • — 4= . <br /> ,,� - <br /> 20. Pave to existing paving"in alley. <br /> 21. Contact the Water District for connecting provisions for this building's water and <br /> sewer services. <br /> 22. A catch basin as per City Standard Plan#402 with a gas trap per Standard Plan #410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity flow across the public right-of-way. <br /> 24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br /> 13D. <br /> Your Public Works Inspector is Cliff Lindman. Call him at 425-339-7404 for questions and inspections <br /> PWComments/Revised 6/8/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.