My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/06/13 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/06/13 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 10:58:36 AM
Creation date
3/10/2017 10:58:20 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Award a construction contract to Consent COUNCIL BILL# <br /> Schwets Construction, Inc. in the X Action Originating Department Parks <br /> amount of$327,950 plus Washington First Reading Contact Person Henry Schroder <br /> State Sales Tax for the Grand Avenue Second Reading Phone Number 257-8372 <br /> Park Renovation Project. Third Reading FOR AGENDA OF June 13, 2007 <br /> Public Hearing <br /> Initialed by: n I <br /> Department Head <br /> J <br /> Council President B <br /> Location Preceding Action Attachments Department(s) Approval <br /> Grand Avenue Park Council approval of Bid Results, Contract Parks, Admin, Legal <br /> 1800 Grand Avenue Call for Bids on <br /> 11/22/06; Budget <br /> Committee approval <br /> of revised plans and <br /> systems ordinance <br /> and contract award <br /> on 05/23/07 <br /> Expenditure Required $327,950.00 (plus WSST) Account Number: 354 5000000026 650 <br /> Amount Budgeted $475,000.00 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> This project will upgrade Grand Avenue Park by providing new sidewalks, flag poles, park signs, <br /> entry pillars, landscape curbing and concrete bollards. Improvements will be made to the existing <br /> overlook incorporating a tile mosaic plaza and a wrought iron railing created by local artists. The <br /> existing PUD lighting will be replaced with new fixtures and new flood lights will be added to <br /> illuminate the flagpoles and the park signs. All electrical wiring will be installed underground. <br /> Existing benches and picnic tables will be relocated onto concrete pads. The park's irrigation <br /> system will also be upgraded. <br /> The Parks Department received three bids on May 22, 2007 ranging from $327,950 to $473,900 <br /> excluding Washington State sales tax. The lowest responsive bidder is Schwets Construction of <br /> Sedro Woolley, WA. <br /> RECOMMENDATION (Exact action requested of Council): Award a construction contract to <br /> Schwets Construction, Inc. in the amount of$327,950 plus Washington State Sales Tax for the <br /> Grand Avenue Park Renovation Project. <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.