Laserfiche WebLink
6 <br /> representatives, as additional insureds. The Contractor shall comply with the insurance <br /> requirements set forth in the General Conditions. Failure to maintain such insurance shall be a <br /> material breach of the Contract. City shall be entitled to damages for such a breach that include, <br /> but are not limited to, any loss (including, but not limited to, third party litigation expenses and <br /> professional fees) suffered by the City if the City is determined to be solely or concurrently <br /> negligent, and if the City suffers any loss or must pay or defend against any such claim, suit, <br /> demand or damage as a result of such breach. <br /> Contractor waives any right of contribution against the City. It is agreed and mutually negotiated <br /> that in any and all claims against the City, its agents or employees, the Contractor, a <br /> subcontractor, anyone directly or indirectly employed by the Contractor or subcontractor, or <br /> anyone for whose acts any of them may be liable, the defense and indemnification obligations <br /> hereunder shall not be limited in any way by any limitation on the amount of damages, <br /> compensation, or benefits payable by or for the Contractor or any subcontractor under industrial <br /> worker's compensation acts, disability benefit acts, or other employees' benefit acts. Contractor's <br /> and City's initials hereto indicate specific waiver of Contractor's industrial insurance immunity <br /> in order to fulfill this indemnity. Solely for the purpose of indemnification and defense as <br /> provided in this Contract, the Contractor specifically waives any immunity under the State <br /> Industrial Insurance Law,Title 51 RCW. The Contractor expressly acknowledges that this waiver <br /> of immunity under Title 51 RCW was the subject of mutual negotiation and was specifically <br /> entered into pursuant to the provisions of RCW 4.24.115. <br /> The Contractor agrees to repair and replace all property of the City and all property of others <br /> damaged by it, its employees, subcontractors, suppliers and agents. <br /> It is understood that the whole of the work under this contract is to be done at the Contractor's <br /> risk and that: (1) prior to submitting its proposal or bid, it became familiar with the conditions of <br /> excavation, subsurface,backfill,materials, climatic conditions, location,traffic, and other <br /> contingencies that may affect the work and has made its bid or proposal accordingly and (2) that <br /> it assumes the responsibility and risk of all loss or damage to materials or work which may arise <br /> from any cause whatsoever prior to completion. <br /> This Contract is effective as of the date of the last person to sign it, and may be executed in <br /> multiple counterparts, each of which shall be deemed an original. <br /> CONTRACTOR: Please fill in the spaces and sign in the box <br /> appropriate for your business entity. <br /> CITY OF EVERETT Corporation <br /> WASHINGTON <br /> [Contractor's Complete Legal Name] <br /> By: By <br /> Typed/Printed Name: <br /> Ray Stephanson, Mayor Its <br /> 32 <br /> 00500 contract.doc 4 of 5 <br />