Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: 3 <br /> AUTHORIZE THE CALL X Consent COUNCIL BILL# <br /> FOR BIDS FOR THE 2007 Action Originating Department ENG/PS <br /> HOT MIX ASPHALT First Reading Contact Person Ryan Sass <br /> OVERLAY PROJECT Second Reading Phone Number 257-8942 <br /> Third Reading FOR AGENDA OF June 13, 2005 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA 4 h-/ J s, <br /> Council President BV� <br /> Location Preceding Action Attachments Department(s)Approval <br /> Various locations in the Vicinity Maps Utilities, Streets <br /> City. <br /> Amount Budgeted $ 1,599,201.50 Est. <br /> Expenditure Required Account Number(s): PW3291 <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> The construction plans and specifications are complete and the project is ready to be advertised for <br /> construction bids. The arterial and residential streets to be overlaid this year have been prioritized and <br /> selected on the basis of the City's Pavement Management System. The overlay project includes a base bid of <br /> approximately 15,576 tons of hot-mix asphalt, a biosolids pad at the Water Pollution Control Facility, and <br /> drying beds at the Water Filtration Plant. The project also includes the utility adjustments and all other <br /> appurtenances necessary to complete the work. <br /> The sources of funds for this project are: <br /> Fund 119 — Street Improvements $1,328,161.50 <br /> Fund 401 —Utilities 271,040.00 <br /> Total $1,599,201.50 <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the call for bids for the 2007 Hot Mix Overlay Project. <br /> 7 <br /> W03291 -Bid Call.doc <br />