Laserfiche WebLink
„ ,,,:,.,,, ,.. :;7_, , ..,, ,..„ „ ______ , ,, ,, ,, , , , , ,__ <br /> ,, \\,, r_, . fil ,, ,,tr ,, , , i , „ [[ \., 1 , ,,, „ jj i ,i( C (0 , ii k' ' bl , i, , <br /> 'ROJECT TITLE: 1 2 <br /> Amendment No. 2 to Consent COUNCIL BILL# <br /> Professional Services X Action Originating Department Public Works <br /> Agreement for Engineering First Reading Contact Person John McClellan <br /> Services from URS Second Reading Phone Number 257-8201 <br /> Corporation for the Portal 3 Third Reading FOR AGENDA OF June 20, 2007 <br /> Relocation Project Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA , ---2225 <br /> Council President i% <br /> Location Preceding Action Attachments Department(s)Approval <br /> Chaplain Reservoir Amendment No. 1 to Amendment No. 2 Public Works -Utilities <br /> PSA with URS <br /> Amount Budgeted $2,640,000 <br /> Expenditure Required 187,642 Account Number(s): UP 3192-1 <br /> Budget Remaining 2,204,858 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The 2002 Water Filtration Plant(WFP)Facilities Plan outlined project recommendations to maintain and <br /> improve operations At the plant. Recommended projects include the relocation of Portal 3. The existing <br /> Portal 3 was constructed in 1930 and no longer serves its purpose (pipeline inlet for reservoir water), and <br /> does not meet current seismic construction codes. The original contract(Professional Services Agreement) <br /> for$218,000 provided for engineering study, design, and construction support services; Amendment No. 1 <br /> provided for$39,500 to perform a detailed seismic analysis of the Portal 3 structure. In addition, URS <br /> prepared an assessment of different construction approaches in order to focus on a more economical solution <br /> for the City. Amendment No. 2 will provide for a redesign based on the recommendations of this <br /> assessment, as well as provide for construction support services from URS. This amendment will bring the <br /> total contract amount to $445,142. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Mayor to sign Amendment No. 2 to the Professional Services Agreement with URS Corporation <br /> for engineering services for the Portal 3 Relocation Project at the Water Filter Plant in the amount of <br /> $187,642.00 <br /> 9 7 <br />