Laserfiche WebLink
fi E r,7 i ,� c5 \ t 1 .HI <br /> r i� r f � �: � �� ,( �� •dt l� �t �s[,t�l�� f � i„ 1(i; <br /> PROJECT TITLE: 13 <br /> LOCAL AGENCY Consent COUNCIL BILL# <br /> STANDARD CONSULTANT X Action Originating Department Engineering <br /> AGREEMENT WITH First Reading Contact Person Ryan Sass <br /> PERTEET, INC., FOR THE Second Reading Phone Number (425)257-8942 <br /> EAST MARINE VIEW Third Reading FOR AGENDA OF June 20, 2007 <br /> DRIVE PHASE IV Public Hearing <br /> CONSTRUCTION Initialed by: <br /> OBSERVATION AND Department Head <br /> ADMINISTRATIVE CAA <br /> SERVICES. la <br /> Council President a <br /> Location Preceding Action Attachments Department(s)Approval <br /> East Marine View Drive 6/12/07 Budget Local Agency Standard <br /> —North Broadway to I-5 Committee Consultant Agreement <br /> 2/6/03 Selection <br /> Committee selected <br /> Perteet, Inc. <br /> Amount Budgeted $1,097,396.00 <br /> Expenditure Required $1,097,396.00 Account Number(s): PW2902 <br /> Budget Remaining - 0 - <br /> Additional Required N/A <br /> DETAILED SUMMARY STATEMENT: <br /> On February 6, 2003, Perteet, Inc., was selected to provide the engineering services for this project. The <br /> Phase IV services include project planning and management, construction administration, construction <br /> observation, earthwork observation, material testing, structural review, construction survey, and review of <br /> field modifications. <br /> Funding for this agreement is: <br /> Federal Grants $ 599,817.00 <br /> Fund 162—CIP4 147,207.00 <br /> Fund 157—Traffic Mitigation 54,408.00 <br /> Fund 401 —Utilities 295,964.00 <br /> Total $1,097,396.00 <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign the Local Agency Standard Consultant Agreement with Perteet, Inc., for the East <br /> Marine View Drive Phase IV Construction Observation and Administrative Services for the sum of <br /> $1,097,396.00. <br /> V). <br /> PW2902 <br /> PW2902 Perteet PSA-CE.doc <br />