Laserfiche WebLink
G <br /> 4.74 caroLLo <br /> enGineers <br /> April 30, 2007 <br /> 7094A.10 <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Attention: Mr. John McClellan <br /> Water Filtration Plant Manager <br /> Subject: Everett Clearwell No. 2, W.O. # UP 3198-2 <br /> Amendment No. 1, Original Contract Date November 15, 2004 <br /> Dear John: <br /> in accordance with our contract discussions, I have modified our recent submittal for <br /> additional fees for the project to reflect our latest discussions. I have documented our level <br /> of effort for the additional design services, and have completed a scope and fee estimate for <br /> engineering services during the construction period. Both of these items are incorporated <br /> into this Amendment No. 1 to the original Professional Services Agreement, dated <br /> November 15, 2004. <br /> Please review this scope of work and attached documents, and feel free to call with any <br /> questions. <br /> Sincerely, <br /> CAROLLO ENGINEERS, P.C. <br /> Charlie Dougherty, P.E. <br /> 9 <br /> HACIien11Everelt SEMContracts'Z7094A10-Clearwell dgdn\Amend 1 Apr 200TMFAcClellan L-043007.doc <br /> 1218 THIRD AVENUE, SUITE 1600 • SEATTLE. WASHINGTON 98101-3032 • (206) 664-6532 • FAX (206) 903-0419 <br />