My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/06/20 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/06/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 11:14:44 AM
Creation date
3/10/2017 11:14:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/20/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Award Construction Contract Consent COUNCIL BILL# <br /> for Clearwell No.2 at the Water X Action Originating Department PW-Utilities <br /> Filtration Plant to Stellar J First Reading Contact Person John McClellan <br /> Corporation Second Reading Phone Number 8201 <br /> Third Reading FOR AGENDA OF 6/20/07 <br /> Public Hearing <br /> Initialed by: <br /> Department Head �. <br /> CAA <br /> Council President ' <br /> Location Preceding Action Attachments Department(s) Approval <br /> Water Filter Plant Advertisement for Bids Bid Tabulation PW-Utilities <br /> Budget Committee: <br /> 6/12/07 <br /> Amount Budgeted $20,500,000 <br /> Expenditure Required $19,333,638 Account Number(s): UP-3198-2 <br /> Budget Remaining 175,000 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The 2002 Water Filtration Plant (WFP) Facilities Plan outlined project recommendations to maintain and <br /> improve operations at the plant. Recommended projects include construction of a new clearwell facility to <br /> increase plant capacity and improve flow management in the water transmission system. The existing <br /> clearwell is nearly 25 years old, and cannot be taken off line for long periods time to allow for maintenance <br /> and repairs until the new clearwell is constructed. The new clearwell will improve drinking water <br /> disinfection operations, aid flow management, and increase effective plant capacity. <br /> Bids for this project were received on May 8th, and Stellar J Corporation of Woodland, Washington was the <br /> apparent low bidder; the Engineer's estimate was $24,970,000. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award to Stellar J Corporation the contract for construction of the Water Filtration Plant's Clearwell No.2 <br /> and authorize the Mayor to sign the contract with this firm for the sum of$19,333,638. <br /> 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.