Laserfiche WebLink
8 <br /> Project: South End Interceptor North Segment Sewer Protection <br /> Change Order No.1 <br /> Change Order Effective Date: May 30, 2007 <br /> CONTRACTOR; <br /> By (, Date: 139 f G 7 <br /> Officer <br /> Contract Time: The contract time was written with an end date of requiring substantial completion <br /> no later than June 15, 2007. No additional days are being allowed by this change order. <br /> Exhibit A—Description of Changed Work <br /> This change order#1 adds new bid item#10 entitled, "Additional Sewer Pipe Protection", at the lump <br /> sum price of$180,000.00. <br /> Justification: <br /> The City of Everett added an additional 200 linear feet in length to the original plan quantity of 350 <br /> linear feet of existing 36-inch sewer force main pipe requiring protection. <br /> The majority of the additional linear feet of sewer pipe protection being added is south of the original <br /> plan quantity. This area has the constraints of the BNSF tracks which exist very close and just west of <br /> the existing sewer pipe requiring protection. <br /> Due to this close proximity of the BNSF tracks to the existing 36-inch sewer pipe the method of laying <br /> back the trench slopes at a 1 to 1 was not an option, and thus required the need of shoring boxes to <br /> protect workers in the excavated area. <br /> Page 3 of 3 <br />