Laserfiche WebLink
INSPECTION REPORT <br /> ii.,.,/./—a— <br /> Date: Ip/3b /14 Permit: e it c>5— 13 0 <br /> ,iiiwio <br /> Contractor: GA, 5 Hect4-eJtJ <br /> Owner: <br /> Site Address: 1 it°5 56-1-C-7 5:1-- <br /> TYPE OF INSPECTION REQUESTED <br /> N ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑ Rough In <br /> El Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> E l Rough In El Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> El Grounding ❑Insulation ❑Mechanical Final ❑ Medical Gas <br /> ■ • n. El Drywall Nailing ❑ Plumbing Final <br /> e -ectrical F al ❑Shear Nailing GAS PIPE <br /> I '-' ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains El Ceiling Grid El Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE' i IT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ' i <br /> ❑OK FOR C.O. CI VIOLATION <br /> El UNABLE TO PERFORM INSPECTION: N <br /> El CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> O -- .4111� Cc P_ A-1 c.44--L- <br /> .p <br /> -4 L- <br /> Inspector Date:—6 (d7/Z <br /> EIR(4/09) aic,in i_ss <br />